Develop preliminary size of major structural framing members
Coordinate critical clearance requirements with architectural and MEP systems
Work with the architect to develop the appropriate plumbing fixture count
Review plumbing-specific requirements related to CBP room data sheets
Review building type, occupancy, and perform overall code analysis related to plumbing systems
Calculate fixture units and rationalize flow rates
Translate overall fixture units/flow rates into pipe sizes for utility mains
Perform load calculations and outdoor air ventilation calculations for proposed layout
Develop preliminary sizes for HVAC equipment based on load calculations
Provide preliminary selections for necessary HVAC equipment including:
Air handling equipment (roof top or ground mounted).
Exhaust fans
Wall/roof openings (if required)
Incorporate preliminary selections, locations, and schedules for the above equipment into drawings
Coordinate roof openings, clearances, and/or chase requirements with the Architectural/Structural team
Coordinate electrical load of equipment with Electrical Engineering team
Initial main duct runs & diffuser/grille layout will be developed in accordance with the floor plan layout