DELIVERABLE
- Schematic Drawings (30%) to SRQ for review and comment
SUBTASKS:
- Perform project management duties such as project planning, invoice preparation, and coordination of design team.
- Further develop three-dimensional (BIM) design models.
- Perform internal constructability review.
Civil
- Conduct site investigation to verify topographic survey, inventory lighting features, electrical vault conditions and other Project-related existing physical features and facilities like drainage structures.
- Develop horizontal pavement geometrical layouts and place sufficient information on drawings to layout proposed pavements in field during construction.
- Develop preliminary three-dimensional design in order to develop pavement centerline profiles, typical sections, and other grading details for the proposed work.
- Analyze data obtained from subsurface soils and existing pavement investigation program and determine properties of existing pavement and soil materials. Document results of program, existing conditions, and recommendations in the design report.
- Develop pavement design for parking lot.
- Develop pavement design in accordance with FAA advisory circular 150/5320-6, latest edition for the taxiway and apron. Pavement design to include two alternatives, one for Portland cement concrete pavement and one utilizing asphalt concrete. Design will include documentation of traffic use of the pavement provided by SRQ for anticipated use. CONSULTANT will use FAARFIELD software to perform design analysis.
- Develop preliminary drainage designs concepts.
- Develop water design concept.
- Develop electrical design concept.
- Develop fiber design concept.