and apron and the parking lot design. It is assumed the layout of the
taxiway and apron will require three (3) different layout options.
- c.Specific preliminary plan sheets developed will be for the following:
- i.General and Geometric Plans
- ii.Concept Phasing Plans
- iii.Typical sections
Architectural
- Review current General Aviation Facilities Design Standard and align program to requirements noted in room data sheets.
- Perform code review based on current adopted Florida Family of Codes and applicable ADA standards.
- Provide up to three floor plan options in alignment with program requirements for review and selection of preferred alternative.
- Develop space matrix to show room sizing and alignment to the Design Standard.
- Develop up to three exterior massing options for the building to establish exterior aesthetic.
- Structural/Mechanical/Electrical/Plumbing/Fire Protection/Low Voltage
- Perform relevant tasks, related to each discipline respectively, described above in "Up Front Field Work/Investigation/Coordination"
- a.Not all items in general scope apply to all trades
- Coordinate with Airport and CBP for layout options on all engineering systems.
- Develop written narratives in report describing basis of design and the impacts and recommendations of each option for review by SRO, CBP, and stakeholders.
TASK 8