lists

DELIVERABLE

  • Goals/Objectives list
  • Action Items list

TASK 2

Schedule coordination - consultant shall provide initial coordination so that project schedules are met for each phase of work included in this contract. Particular phases of design may be delayed by the FAA and FDOT review process.

DELIVERABLE

  • Written Schedule

TASK 3

Perform a preliminary Project site inspection to further familiarize the design team with Project areas.

DELIVERABLE

  • Field Report

TASK 4

Design Team will coordinate requirements for topographic field survey and Hyatt will perform field survey.

DELIVERABLE

  • Field Survey Drawings

SUBTASKS:

  1. Hyatt Survey will perform a Topographic Survey in alignment with Exhibit No. 01 located at the Sarasota Bradenton International Airport (SRQ) in Manatee County, Florida.
  2. The survey shall include the location and identification of all above ground, visible structures (including overhead wires) and features along with any accessible subterranean features including pipe inverts with size and material.
  3. Hyatt Survey will locate all mark or flagged utilities based on client provided as-built drawings that are available.