The Programming/Concept Phase is intended to identify and evaluate alternatives to provide cost-effective and practical solutions for the work items identified.
Sarasota Bradenton International Airport and the CBP has requested, as a part of the initial phase, C&S evaluate design and layout alternatives and through coordination with stakeholders, review of the pre-proposal documents, field investigations, and a practical design approach.
Overall result of Programming will be incorporated in the 30% Schematic Drawings for review by all stakeholders.
The specific services to be provided or furnished for this Phase of the Project are the following:
Up Front Field Work/Investigation/Coordination (all items listed below to be performed and coordinated by entire Design Team):
Design Project Manager and necessary key design team members will attend a pre-design charrette with SRQ and CBP to review the scope of services and become familiar with the Project requirements and operational concerns during the Project's design and construction.