The Project will consist of the following phases and breakdown:
Part I (Design)
The Design team will submit one construction documents package for the design of the GA FIS Facility. Each package will consist of the following deliverables:
- Programming/Concept Design
- Schematic Design (30%)
- Design Development (60%)
- Construction Documents (90%)
- Construction Documents (100%)
- oPermit Documents
- Bidding and Award
Part II (Construction)
- Not included in this Scope of Work