The Project will consist of the following phases and breakdown:

Part I (Design)

The Design team will submit one construction documents package for the design of the GA FIS Facility. Each package will consist of the following deliverables:

  • Programming/Concept Design
  • Schematic Design (30%)
  • Design Development (60%)
  • Construction Documents (90%)
  • Construction Documents (100%)
  • Permit Documents
  • Bidding and Award

Part II (Construction)

  • Not included in this Scope of Work