The Project will consist of the following phases and breakdown:
Part I (Design)
The Design team will submit one construction documents package for the design of the GA FIS Facility. Each package will consist of the following deliverables:
Programming/Concept Design
Schematic Design (30%)
Design Development (60%)
Construction Documents (90%)
Construction Documents (100%)
Permit Documents
Bidding and Award
Part II (Construction)
Not included in this Scope of Work