EXHIBIT "A"
SCOPE OF SERVICES
SARASOTA BRADENTON INTERNATIONAL AIRPORT
COMMERCIAL APRON EXPANSION/TAXIWAY R5 REHABILITATION and
REMOVAL OF TAXIWAY A8
Registered Surveyor.
Deliverables:
One (1) electronic file in AutoCAD/Civil 3D dwg format of topographic survey. Include ground surface contours/TIN in Civil3D format or LandXML format.
Two (2) signed and sealed topographic survey drawing sheets. Prepared on 24" x 36" sheets. Horizontal scale as necessary for required detail. Drawing to show all line work for collected features.
Text file of all data collected showing, Point Number, Northing, Easting, Description, and Elevation.
Level of Service:
Conduct design geotechnical exploration and testing for the pavement design, site grading, drainage and storm water permitting by a Florida Registered Geotechnical Engineer and firm.
Deliverables:
One (1) hard copy original signed and sealed geotechnical report will be submitted to the Airport, FAA and FDOT.
Electronic PDF versions of the geotechnical report will be submitted to the Airport, FAA and FDOT.
Field geotechnical exploration results.
Laboratory testing results.
Design geotechnical report.
Level of Service:
Assist the Airport with Environmental Resource Permitting with the Southwest Florida Water Management District (SWFWMD) and with Sarasota County. Since Taxiway R5 will be relocated and with the apron expansion will remove current open space and flood storage, the following services are anticipated.
Calculations – Refine the Master Drainage Plan water quantity, event based calculations using the EPA SWMM master model for the airport. Three hyetographs will be used covering the 10-year, 25-year and 100-year recurrence interval, 24-hour duration events. These will be used to demonstrate to SWFWMD and Sarasota County that the quantity changes are accommodated in the airport's master drainage system previously permitted as SWFWMD Permit No. 9458.045, and by Sarasota County on prior South Quadrant projects at the airport. Also, if necessary for FAA consideration, a separate calculation using the Rational Method with a 5-year event may be done. No continuous simulation EPA-SWMM water quality model updates are included. The ledger adjustment for water quality management is expected to be used and is included in this scope to demonstrate water quality requirements are met.
Permit Application – A permit application package for SWFWMD and for Sarasota County (water quantity management only) will be prepared. This scope anticipates that the application will be a minor modification done by letter report in both cases.