Level of Service:
Prepare the Engineer’s Report for the project. The report will discuss design criteria, specific design solutions, modifications to standards, design calculations, and construction time allowances.
Deliverables:
Level of Service:
Attend one (1) pre-bid meeting with Airport and contractors. Prepare meeting agenda, sign-in sheet and meeting notes. The meeting notes and sign-in sheet will be electronically distributed to attendees.
Deliverables:
Level of Service:
Prepare up to two (2) addenda packages and clarification letters in response to bidder questions under the direction of the Project Engineers as applicable.
Deliverables:
Responses to bidder questions and revisions to applicable construction plans and specifications.
Level of Service:
Attend bid opening. Prepare a tabulation of bids and bidder submittal items. The recommendation letter will comment on the responsiveness and regularity of the bidders' submittal items, and either recommend award to the low responsive and responsible bidder or rejection of bids if none are acceptable.
Deliverables:
Level of Service:
Conduct design topographical surveys of the project limits under the direction of a Florida