During the design process, the construction plans will be coordinated with the Airport and comments will be incorporated. Weekly project meetings will be coordinated either virtually or in person in order to accelerate the project schedule.
The project specifications will be updated from the Preliminary Design draft to match final design plans and requirements. The updated set will use the standard specifications of FAA Advisory Circular 150/5370-10, latest edition current as of the date of this task order, adapted to the project including any approved modifications to standards.
Update the draft CSPP prepared during Preliminary Design and submit the final Construction Safety and Phasing Plan (CSPP) to the FAA's OE-AAA web site.
Deliverables:
Update the opinion of probable construction cost based on the final design. The Airport recognizes and agrees that EGS does not have control over Contractor's pricing strategies or costs and that estimate may vary from actual bid or construction costs.
Coordinate a pre-design meeting with the Airport, FAA, FDOT and other stakeholders as applicable. Prepare meeting agenda and handout documents. Attend meeting.
Deliverables: