EXHIBIT "A" SCOPE OF SERVICES SARASOTA BRADENTON INTERNATIONAL AIRPORT COMMERCIAL APRON EXPANSION/TAXIWAY R5 REHABILITATION and REMOVAL OF TAXIWAY A8

developed following applicable FAA Advisory Circulars and Specifications. The anticipated construction plan sheets to be generated are as follows: • Cover Sheet

  • Cover Sheet
Cover SheetPaving Elevation Plans
Project Drawing ListPavement Sections
Summary of QuantitiesCross Sections
Abbreviations/LegendGrading and Drainage Plans
Contract Layout PlanDrainage Profiles
Airspace Surface Protection PlanGrading and Drainage Details
Phasing PlansDrainage Structure Details
Maintenance of Traffic PlansPavement Marking Plans
Boring Log & Pavement CoresPavement Marking Details
Subsurface Utility DataGeneral Notes - Airfield Electrical
Existing Conditions/SurveyAirfield Signage Modifications
Erosion & Sedimentation Control PlanAirfield Signage Details
Erosion & Sedimentation Control DetailsAirfield Electrical Abbrev/Legend
Site Demolition PlansAirfield Electrical Demolition Plans
Site Demolition DetailsAirfield Electrical Lighting Plans
Geometry and Paving PlansAirfield Electrical Details
PCC Pavement Jointing PlansOne Line Diagrams
  • PCC Jointing Details During the design process, the construction plans will be coordinated with the Airport and comments will be incorporated. Weekly project meetings will be coordinated either virtually or in person in order to accelerate the project schedule.

During the design process, the construction plans will be coordinated with the Airport and comments will be incorporated. Weekly project meetings will be coordinated either virtually or in person in order to accelerate the project schedule.

Deliverables:

  • Electronic PDF versions of the preliminary construction plans will be prepared.

2.2 Project Manual and Specifications

Level of Service:

A draft of the project specifications will be prepared using the standard specifications of FAA Advisory Circular 150/5370-10, latest edition current as of the date of this task order, adapted to the project including any proposed modifications to standards.

2.3 Modifications to Standards

Level of Service

Modifications to Standards, per FAA Order 5300.1G, will be requested, as necessary, defining the need and providing the justifications as part of this effort. If the Airport has general or special provisions to use in lieu of the FAA specification that have not been previously approved, these must be submitted for consideration per FAA Order 5300-1G. This scope of services excludes new submittals of that type except for minor sentence or paragraph changes to previously approved airport general or special provisions.

Deliverables: