EXHIBIT "A"
SCOPE OF SERVICES
SARASOTA BRADENTON INTERNATIONAL AIRPORT
COMMERCIAL APRON EXPANSION/TAXIWAY R5 REHABILITATION and
REMOVAL OF TAXIWAY A8
developed following applicable FAA Advisory Circulars and Specifications. The anticipated construction plan sheets to be generated are as follows:
• Cover Sheet
Cover Sheet
| Cover Sheet | Paving Elevation Plans |
|---|
| Project Drawing List | Pavement Sections |
|---|
| Summary of Quantities | Cross Sections |
|---|
| Abbreviations/Legend | Grading and Drainage Plans |
|---|
| Contract Layout Plan | Drainage Profiles |
|---|
| Airspace Surface Protection Plan | Grading and Drainage Details |
|---|
| Phasing Plans | Drainage Structure Details |
|---|
| Maintenance of Traffic Plans | Pavement Marking Plans |
|---|
| Boring Log & Pavement Cores | Pavement Marking Details |
|---|
| Subsurface Utility Data | General Notes - Airfield Electrical |
|---|
| Existing Conditions/Survey | Airfield Signage Modifications |
|---|
| Erosion & Sedimentation Control Plan | Airfield Signage Details |
|---|
| Erosion & Sedimentation Control Details | Airfield Electrical Abbrev/Legend |
|---|
| Site Demolition Plans | Airfield Electrical Demolition Plans |
|---|
| Site Demolition Details | Airfield Electrical Lighting Plans |
|---|
| Geometry and Paving Plans | Airfield Electrical Details |
|---|
| PCC Pavement Jointing Plans | One Line Diagrams |
|---|
PCC Jointing Details
During the design process, the construction plans will be coordinated with the Airport and comments will be incorporated. Weekly project meetings will be coordinated either virtually or in person in order to accelerate the project schedule.
During the design process, the construction plans will be coordinated with the Airport and comments will be incorporated. Weekly project meetings will be coordinated either virtually or in person in order to accelerate the project schedule.
Deliverables:
Electronic PDF versions of the preliminary construction plans will be prepared.
Level of Service:
A draft of the project specifications will be prepared using the standard specifications of FAA Advisory Circular 150/5370-10, latest edition current as of the date of this task order, adapted to the project including any proposed modifications to standards.
Level of Service
Modifications to Standards, per FAA Order 5300.1G, will be requested, as necessary, defining the need and providing the justifications as part of this effort. If the Airport has general or special provisions to use in lieu of the FAA specification that have not been previously approved, these must be submitted for consideration per FAA Order 5300-1G. This scope of services excludes new submittals of that type except for minor sentence or paragraph changes to previously approved airport general or special provisions.
Deliverables: