| Item Description | Unit | Unit Price | Quantity | Total |
|---|---|---|---|---|
| Contamination Field Investigation | ||||
| 418-Geo Drill Crew Support Vehicle | Day | $ 160.00 | 2 | $ 320.00 |
| Contamination Test Units | ||||
| 856-Field Sampling Kit | Each | $ 75.00 | 2.00 | $ 150.00 |
| 880-RCRA 8 Metals (Method 6010/7471) | Each | $ 65.00 | $- | |
| 882-RCRA Metals Individual (Method 6010/7471) | Each | $ 9.00 | 12.00 | $ 108.00 |
| 884-Mercury Individual (Method 6010/7471) | Each | $ 25.00 | $- | |
| 890-SPLP/TCLP Metals | Each | $ 198.00 | 6.00 | $ 1,188.00 |
| 892-Asbestos Samples | Each | $ 15.00 | 70.00 | $ 1,050.00 |
| Contamination and Technical Support Services | ||||
| Chief Scientist | Hour | $ 155.10 | 5 | $ 775.50 |
| Senior Project Engineer | Hour | $ 163.19 | 5 | $ 815.95 |
| Senior Scientist | Hour | $ 120.15 | 16 | $ 1,922.40 |
| Designer | Hour | $ 96.91 | $- | |
| Sr Engineering Technician | Hour | $ 85.17 | 40 | $ 3,406.80 |
| Geotechnical Technician | Hour | $ 68.65 | $- | |
| Secretary/Clerical | Hour | $ 78.02 | 1 | $ 78.02 |
| Total Estimated Fee | $ 9,814.67 | |||
3