Primary Canopies and Optional Canopies Geotechnical Services
SRQ Airport Ground Transportation Improvements Tierra Project No. 6511-21-068
Tierra Inc Standard Fee Schedule
Item DescriptionUnitUnit PriceQuantityTotal
Asphalt and Concrete Pavement Coring
209-Asphalt Pavement Coring – 4" dia with Base Depth CheckEach$ 125.00$ -
210-Asphalt Pavement Coring – 4" dia without Base Depth CheckEach$ 110.00$ -
211-Asphalt Pavement Coring – 6" dia with Base Depth CheckEach$ 125.008$ 1,000.00
212-Asphalt Pavement Coring – 6" dia without Base Depth CheckEach$ 110.00$ -
305-Concrete Pavement Coring - 4" DiaEach$ 110.00$ -
306-Concrete Pavement Coring - 6" DiaEach$ 110.00$ -
603-Mobilization Asphalt Coring equipmentEach$ 250.001$ 250.00
606-Mobilization Concrete CoringEach$ 250.00$ -
Geotechnical Soil Laboratory Testing
812-Soils Materials Finer than 200 Sieve (FM 1-T011)Test$ 42.0010$ 420.00
817-Soils Moisture Content Laboratory (AASHTO T 265)Test$ 10.006$ 60.00
821-Soils Particle Size Analysis (AASHTO T 88) (Including Hydrometer)Test$ 131.00$ -
822-Soils Particle Size Analysis (AASHTO T 88) (No Hydrometer)Test$ 67.00$ -
805-Soils Corrosion Series (FM 5-550 through 5-553)Test$ 175.00$ -
825-Soils pH Soil or Water (FM 5-550)Test$ 35.00$ -
829-Soils Resistivity Soil or Water (FM 5-551)Test$ 46.00$ -
800-Soils Chloride Soil or Water (FM 5-552)Test$ 46.00$ -
833-Soils Sulfate Soil or Water (FM 5-553)Test$ 48.00$ -
819-Soils Organic Content Ignition (FM 1 T-267)Test$ 42.001$ 42.00
Atterberg Limit Tests (AASHTO T-89 and T-90) CombinedTest$ 130.005$ 650.00
826-Soils Plastic Limit & Plasticity Index (AASHTO T 90)Test$ 70.00$ -
811-Soils Liquid Limit (AASHTO T 89)Test$ 60.00$ -
823-Soils Permeability Constant Head (AASHTO T 215)Test$ 175.00$ -
824-Soils Permeability Falling Head (FM 5-513)Test$ 175.00$ -
827-Soils Proctor Modified (FM 1-T 180)Test$ 115.00$ -
828-Soils Proctor Standard (AASHTO T 99)Test$ 111.00$ -
832-Soils Splitting Tensile Strength of Rock Cores (ASTM D3967)Test$ 138.00$ -
838-Soils Unconfined Compression - Rock (ASTM D7012, Method C)Test$ 138.00$ -
803-Soils Consolidation - Constant Strain (ASTM D4186)Test$ 580.00$ -
804-Soils Consolidation - Extended Load Increments (AASHTO T216)Each$ 50.00$ -
806-Soils Direct Shear Consolidated Drained/ Point AASHTO T 236Test$ 250.00$ -
810-Soils Limerock Bearing Ratio (LBR)(FM 5-515)/CBRTest$ 340.00$ -
Engineering and Technical Support Services
Project ManagerHour$ 190.00$ -
Senior EngineerHour$ 190.004$ 760.00
Chief ScientistHour$ 155.10$ -
Senior Project EngineerHour$ 163.19$ -
Geotechnical EngineerHour$ 137.368$ 1,098.88
Engineering InternHour$ 95.0014$ 1,330.00
Senior ScientistHour$ 120.15$ -
DesignerHour$ 96.914$ 387.64
Sr Engineering TechnicianHour$ 85.178$ 681.36
Geotechnical TechnicianHour$ 68.658$ 549.20
Secretary/ClericalHour$ 78.022$ 156.04
Total Estimated Fee$ 14,261.37
2