3.0 Design Development Phase (60% Submittal)

3.6 Landscape Plans

  • Landscape Plans
  • Material Plan List and Notes

3.11 Meetings

  • Design Coordination Meetings - Two (2) Virtual Meetings
  • Design Review Meeting - One (1) Virtual Meeting

Deliverables:

  • 60% Design Plans
  • Technical Specifications
  • Final Calculations
  • Opinion of Probable Costs

4.0 100% Construction Documents Phase

Provide Final Bid and Construction Documents, including design drawings, and associated details sufficient for bidding and construction.

4.6 Landscape Plans

  • Landscape Plans
  • Material Plan List and Notes

4.7 Cost Estimate

  • A. 36% Opinion of Probable Construction Cost

4.12 Meetings

  • Design Coordination Meetings - Two (2) Virtual Meetings
  • Design Review Meeting - One (1) Virtual Meeting

5.0 Bidding Phase Services

5.1 Incorporate final Airport comments from 100% Construction Drawings into Bid Documents.

5.2 Provide assistance to the Airport for any revisions required during Bidding Phase to be published with Addendum documents.

Deliverables

Electronically signed and sealed digital plans (landscape plans and irrigation plans), including all notes, details, quantities, spacing/locations, dimensioning, calculations, plan enlargements, and specifications of all proposed materials.

All work will be based on site plans created/provided by AVCON, Inc.

Additional Services

Services beyond Landesco's Basic Services may be provided if confirmed and agreed to in writing. Additional Services include modifications to the final construction documents due to Client's changes, or changes to other consultant's drawings which directly or indirectly affect Landesco's final drawings. Additional Services are provided either on a set fee, agreed to in advance in writing, or on an hourly basis.