3.0 Design Development Phase (60% Submittal)
3.6 Landscape Plans
Landscape Plans
Material Plan List and Notes
3.11 Meetings
Design Coordination Meetings - Two (2) Virtual Meetings
Design Review Meeting - One (1) Virtual Meeting
Deliverables:
60% Design Plans
Technical Specifications
Final Calculations
Opinion of Probable Costs
4.0 100% Construction Documents Phase
Provide Final Bid and Construction Documents, including design drawings, and associated details sufficient for bidding and construction.
4.6 Landscape Plans
Landscape Plans
Material Plan List and Notes
4.7 Cost Estimate
A. 36% Opinion of Probable Construction Cost
4.12 Meetings
Design Coordination Meetings - Two (2) Virtual Meetings
Design Review Meeting - One (1) Virtual Meeting
5.0 Bidding Phase Services
5.1 Incorporate final Airport comments from 100% Construction Drawings into Bid Documents.
5.2 Provide assistance to the Airport for any revisions required during Bidding Phase to be published with Addendum documents.
Deliverables
Electronically signed and sealed digital plans (landscape plans and irrigation plans), including all notes, details, quantities, spacing/locations, dimensioning, calculations, plan enlargements, and specifications of all proposed materials.
All work will be based on site plans created/provided by AVCON, Inc.
Additional Services
Services beyond Landesco's Basic Services may be provided if confirmed and agreed to in writing. Additional Services include modifications to the final construction documents due to Client's changes, or changes to other consultant's drawings which directly or indirectly affect Landesco's final drawings. Additional Services are provided either on a set fee, agreed to in advance in writing, or on an hourly basis.