EG Solutions, Inc 9015 Town Center Pkwy, Suite 106 Lakewood Ranch, FL 34202 941-567-1622
SARASOTA BRADENTON INTERNATIONAL AIRPORT GROUND TRANSPORTATION CENTER VATER MANAGEMENT AND PERMITTING SCOPE OF SERVICES
04/07/2021
I. Data Collection Review and Comment
Review and comment on the geotechnical and survey scopes for the Ground Transportation Center at SRQ with respect to water management design and permitting data requirements.
II. Site Plans Review and Comment
Review and comment on site plans including alternative layouts for the Ground Transportation Center Project at SRQ for compatibility with the Master Drainage Plan and the master Environmental Resources Permit (ERP) for the airport. Provide comments on site drainage interface with the Master Drainage System. Site drainage design will be done by AVCON.
III. Construction Stormwater Pollution Prevention Plan
Assist AVCON with the erosion and sedimentation control plans and specifications. These documents will be included with permit applications. AVCON will produce the drawing sheets and specifications.
IV. Narrative and Ledger Adjustments
Prepare a short water management narrative and adjustments to the ledger in the airport's ERP to support the minor modification of the ERP for the Ground Transportation Center Project construction.
V. Minor Modification Construction ERP Application
Prepare and submit the request for a minor modification of the airport's ERP for construction of the Ground Transportation Center Project.
VI. Sarasota County Permit Assistance
Prepare the water management sections for site permits from Sarasota County.
VII. Meetings
Attend the pre-application meetings with the Southwest Florida Water Management District (SWFWMD) and Sarasota County to discuss stormwater permitting for this project. Attend up to two meetings to provide supporting information for permitting. Attend one site reconnaissance meeting with AVCON to review site conditions with respect to water management coordination and permitting.