Construction Documents (100%)
Produce detailed construction documents and specifications, as necessary. Typical deliverable will include:
- Sign Location Plans
- Sign Graphic Layouts*
- Sign Mounting Elevations
- Sign Fabrication Details
- Technical Specifications
- *A Sign Message Schedule will be provided only if sign messaging is not included in Sign Graphic Layouts.
Task 2: GTC Building Exterior
Conceptual Design (30%)
Provide design concepts to address the signage requirements as dictated by necessary architectural and messaging considerations. Typical deliverable will include:
- Sign Type Location Plans
- Sign Design and Message Layout Concepts
- Fabrication and Materials Notes
Design Development (60%)
Limited review and comment on 60% deliverable developed by AVCON.
Construction Documents (100%)
Limited review and comment on 100% deliverable developed by AVCON.
MEETINGS / PRESENTATIONS
On-Site Meetings (travel required): None
Project coordination meetings: Up to two (2) video meetings per submittal at 30%, 60%, and 100%.
PROJECT SCHEDULE
| Schematic Design: | TBD |
|---|
| Design Development: | TBD |
|---|
| 100% Construction Documents: | TBD |
|---|
| Total Project Schedule: | TBD |
|---|
ASSUMPTIONS & CLARIFICATIONS / EXCLUSIONS
Assumptions
- All deliverables to be submitted electronically.
- Availability of accurate plan documents necessary to complete all required tasks and subtasks for this project.
- All destination terminology will be provided to Apple Designs by others.