Construction Documents (100%)
Produce detailed construction documents and specifications, as necessary. Typical deliverable will include:
Sign Location Plans
Sign Graphic Layouts*
Sign Mounting Elevations
Sign Fabrication Details
Technical Specifications
*A Sign Message Schedule will be provided only if sign messaging is not included in Sign Graphic Layouts.
Task 2: GTC Building Exterior
Conceptual Design (30%)
Provide design concepts to address the signage requirements as dictated by necessary architectural and messaging considerations. Typical deliverable will include:
Sign Type Location Plans
Sign Design and Message Layout Concepts
Fabrication and Materials Notes
Design Development (60%)
Limited review and comment on 60% deliverable developed by AVCON.
Construction Documents (100%)
Limited review and comment on 100% deliverable developed by AVCON.
MEETINGS / PRESENTATIONS
On-Site Meetings (travel required): None
Project coordination meetings: Up to two (2) video meetings per submittal at 30%, 60%, and 100%.
PROJECT SCHEDULE
Schematic Design:TBD
Design Development:TBD
100% Construction Documents:TBD
Total Project Schedule:TBD
ASSUMPTIONS & CLARIFICATIONS / EXCLUSIONS
Assumptions
All deliverables to be submitted electronically.
Availability of accurate plan documents necessary to complete all required tasks and subtasks for this project.
All destination terminology will be provided to Apple Designs by others.