o TranSystems will provide full design documents including drawings and specifications as needed for the demolition of the existing overhang for the Terminal Building. Plans and specifications will be issued to AVCON for review by AVCON and Airport Authority at 30, 60, 90 and 100%, as part of New Work Canopy documents. Comments of each review will be incorporated into drawings and specifications of the following submittal.
Documents for Demolition of existing overhang: