ManhoursCostManhoursCostManhoursCostManhoursCostManhoursCostManhoursCostManhoursCostAvg Hourly Rate
4.11 Meetings
A. Design Coordination Meetings (2)$-$-$-$-$-$-$-
B. Design Review Meeting$-$-$-$-$-$-$-
Sub-Total Construction Documents9$1,980.00104$18,200.00173$23,355.00340$37,400.00149$14,900.00
5.0 Bidding Phase Services
5.1 Incorporate Airport Comments$-$-2$270.006$660.0018$1,600.004
5.2 Prepare Addendums$-$-2$270.006$660.0012$1,200.004
5.3 Assist with Pre-Bid Conference$-$-6$810.006$660.0018$1,800.004
5.4 Answer Bidders Questions$-$-4$540.008$880.00$-12
5.5 Bid Evaluation and Recommendation of Award$-$-4$540.002$220.00$-4
Sub-Total Bidding & Award0$-0$-18$2,430.0028$3,080.0048$4,800.00
Total LABOR Cost47$10,340.00374$65,450.00741$100,039.001042$114,620.00532$53,200.00
Program Verification$ 45,850.00$ 10,564.00$ 18,000.00$ 700.00$ 9,814.67$ 10,880.63$ 892.64$ 96,701.94
Schematic Design (30%)$ 73,269.00$ 26,268.00$ 29,425.00--$ 2,570.00$ 14,261.37$ 11,990.33$ 9,938.18$ 167,721.88
Design Development (60%)$ 119,465.00$ 60,396.00-$ 1,650.00$ 3,808.66$ 185,319.66
Construction Documents (100%)$ 95,835.00$ 50,226.00-$ 2,080.00$ 8,985.98$ 157,126.98
Bidding & Award$ 11,270.00$ 1,302.00-$ 1,500.00$ 1,904.32$ 15,976.32
Reimbursables$ 2,500.00$ 2,097.50$-$ 4,597.50
Total Cost$ 348,189.00$ 150,853.50$ 29,425.00$ 18,000.00$ 8,500.00$ 24,076.04$ 22,870.96$ 25,529.78$ 627,444.28
Page 5
AVCON, INC.