| 3.11 Meetings | Manhours | Cost | Manhouses | Cost | Manhours | Cost | Manhouses | Cost | Manhours | Cost | Manhouses | Cost | Manhours | Cost | Avg. Hourly Ratio | |
|---|
| A. Design Coordination Meetings (2) | S | - | 12 | $2,100.00 | 12 | $1,620.00 | S | - | S | - | S | - | 24 | $3,720.00 | $155.00 | |
|---|
| B. Design Review Meeting | S | - | 6 | $1,050.00 | 6 | $810.00 | S | - | S | - | S | - | 12 | $1,660.00 | $155.00 | |
|---|
| C. Meeting with Utility Providers | S | - | - | S | 6 | 810.00 | S | - | S | - | S | - | 8 | $810.00 | $155.00 | |
|---|
| Sub-Total Design Development | 9 | $1,980.00 | 128 | $22,400.00 | 275 | $37,125.00 | 350 | $42,900.00 | 147 | $14,700.00 | 6 | $360.00 | 955 | $119,455.00 | $125.09 | |
|---|
| | | | | | | | | | | | | | | | |
| 4.0 Construction Documents (100%) | | | | | | | | | | | | | | | | |
|---|
| 4.1 CivilSite Drawings | | | | | | | | | | | | | | | | |
|---|
| A. Existing Conditions / Survey | S | - | 1 | $175.00 | 1 | $135.00 | 2 | $250.00 | S | - | S | - | 4 | $530.00 | $137.50 | |
|---|
| B. Distribution Plan | 1 | S | 220.00 | 8 | $1,400.00 | 4 | $540.00 | 4 | $440.00 | S | - | S | 17 | $2,020.00 | $132.94 | |
|---|
| C. Site Plan | 2 | S | 440.00 | 8 | $1,400.00 | 8 | $1,650.00 | 24 | $2,640.00 | S | - | S | 42 | $5,560.00 | $132.38 | |
|---|
| D. Co-meeting Plan | 2 | S | 440.00 | 8 | $1,400.00 | 8 | $1,650.00 | 24 | $2,640.00 | S | - | S | 42 | $5,560.00 | $132.38 | |
|---|
| E. Grading and Drainage Plan | 2 | S | 440.00 | 8 | $1,400.00 | 8 | $1,650.00 | 24 | $2,640.00 | S | - | S | 42 | $5,560.00 | $132.38 | |
|---|
| F. Utility Plans See Bell | S | - | - | - | -01 | - | 0 | - | S | - | 0 | - | 0 | S | - | |
|---|
| G. Signing and Marking Plans | 2 | S | 440.00 | 8 | $1,400.00 | 8 | $1,650.00 | 24 | $2,640.00 | S | - | S | 42 | $5,560.00 | $132.38 | |
|---|
| H. Signage Graphics and Details | S | - | 2 | S | 350.00 | 8 | 1,050.00 | 24 | $2,640.00 | S | - | S | 34 | $4,070.00 | $119.71 | |
|---|
| I. Site Lighting / Photometrics | S | - | 2 | S | 350.00 | 8 | 1,050.00 | 24 | $2,640.00 | S | - | S | 34 | $4,070.00 | $119.71 | |
|---|
| J. Civil Details | S | - | 2 | S | 350.00 | 2 | $210.00 | 2 | $210.00 | S | - | S | 8 | $4,000.00 | $140.00 | |
|---|
| K. Site Lighting Details | S | - | 2 | S | 350.00 | 2 | $210.00 | 2 | $220.00 | S | - | S | 6 | $640.00 | $140.00 | |
|---|
| L. SMPPP | S | - | 2 | S | 350.00 | 2 | $270.00 | 2 | $220.00 | S | - | S | 8 | $640.00 | $140.00 | |
|---|
| M. 2 Vehicle Tracking / ITS Plans | | | | | | | | | | | | | | | | |
|---|
| A. Technology Plans | S | - | 4 | $720.00 | 8 | $1,650.00 | 8 | $630.00 | 16 | $1,500.00 | S | - | 36 | $4,250.00 | $118.33 | |
|---|
| B. Technology Details | S | - | 2 | S | 350.00 | 8 | $1,650.00 | 8 | $850.00 | 4 | - | - | 22 | $2,710.00 | $123.18 | |
|---|
| 4.3 Driver's Lounge Plans | | | | | | | | | | | | | | | | |
|---|
| A. Architectural Floor Plan (See Translytans) | S | - | - | - | - | - | - | - | S | - | S | - | - | - | - | |
|---|
| B. Architectural Roof Plan (See Translytans) | S | - | - | - | - | - | - | - | S | - | S | - | - | - | - | |
|---|
| C. Architectural Elevations (See Translytans) | S | - | - | - | - | - | - | - | S | - | S | - | - | - | - | |
|---|
| D. Architectural Sections and Details | S | - | - | S | - | - | - | - | - | S | - | S | - | S | - | |
|---|
| E. Structural Foundation Plan | S | - | 2 | S | 350.00 | 8 | 1,650.00 | 12 | $1,300.00 | 16 | $1,850.00 | S | - | 33 | $4,350.00 | $114.47 |
|---|
| F. Structural Floor Plan | S | - | 2 | S | 350.00 | 8 | 1,650.00 | 12 | $1,320.00 | 16 | $1,850.00 | S | - | 33 | $4,350.00 | $114.47 |
|---|
| G. Structural Roof Plan | S | - | 2 | S | 350.00 | 8 | 1,650.00 | 12 | $1,320.00 | 16 | $1,850.00 | S | - | 38 | $4,350.00 | $114.47 |
|---|
| H. Structural Details | S | - | 2 | S | 350.00 | 4 | $540.00 | 2 | $220.00 | S | - | S | 8 | $1,110.00 | $138.75 | |
|---|
| I. Beam / Column Schedules | S | - | 2 | S | 350.00 | 4 | $540.00 | 2 | $210.00 | S | - | S | 6 | $1,110.00 | $138.75 | |
|---|
| J. HVAC Plans | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $120.56 |
|---|
| K. HVAC Schedules | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $120.56 |
|---|
| L. HVAC Details | S | - | 2 | S | 350.00 | 2 | $270.00 | 4 | $440.00 | 2 | $200.00 | S | - | 10 | $1,250.00 | $126.00 |
|---|
| M. Plumbing Plan | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $126.00 |
|---|
| N. Plumbing Schedules | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $126.00 |
|---|
| O. Plumbing Details | S | - | 2 | S | 350.00 | 2 | $270.00 | 2 | $220.00 | 2 | $200.00 | S | - | 8 | $1,040.00 | $130.00 |
|---|
| P. Plumbing Isometrics | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $126.00 |
|---|
| Q. Electrical Plan | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $126.00 |
|---|
| R. Lighting Plans | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $126.00 |
|---|
| S. Electrical Schedules | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $126.00 |
|---|
| T. Electrical Details | S | - | 2 | S | 350.00 | 2 | $270.00 | 4 | $440.00 | 2 | $200.00 | S | - | 10 | $1,250.00 | $126.00 |
|---|
| U. Technology Plans | S | - | 2 | S | 350.00 | 4 | $540.00 | 8 | $850.00 | 4 | $400.00 | S | - | 16 | $2,170.00 | $126.00 |
|---|
| V. Technology Details | S | - | 2 | S | 350.00 | 2 | $270.00 | 4 | $440.00 | 4 | $400.00 | S | - | 12 | $1,450.00 | $121.87 |
|---|
| 4.4 Canopy Drawings | | | | | | | | | | | | | | | | |
|---|
| A. Architectural Plan (See Translytans) | S | - | - | - | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| B. Architectural Elevations (See Translytans) | S | - | - | S | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| C. Architectural Details (See Translytans) | S | - | - | - | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| D. Structural Foundation Plan | S | - | 2 | S | 350.00 | 4 | $540.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 22 | $2,610.00 | $116.64 |
|---|
| E. Structural Elevators | S | - | 2 | S | 350.00 | 4 | $540.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 22 | $2,610.00 | $116.64 |
|---|
| F. Structural Details | S | - | 2 | S | 350.00 | 4 | $540.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 22 | $2,610.00 | $116.64 |
|---|
| G. Lighting Future Schedule | S | - | 1 | $175.00 | 2 | $270.00 | 4 | $440.00 | 2 | $200.00 | S | - | 9 | $1,085.00 | $120.50 | |
|---|
| H. Lighting Photometrics | S | - | 1 | $175.00 | 2 | $270.00 | 4 | $440.00 | 2 | $800.00 | S | - | 11 | $1,245.00 | $121.18 | |
|---|
| I. Lighting Details | S | - | 1 | $175.00 | 2 | $270.00 | 2 | $220.00 | 1 | $100.00 | S | - | 6 | $765.00 | $127.50 | |
|---|
| A. May/finding Lights | | | | | | | | | | | | | | | | |
|---|
| A. Building Interior | | | | | | | | | | | | | | | | |
|---|
| 1. Sign Location Plan (See Apple) | S | - | - | - | - | - | - | - | S | - | S | - | - | - | - | |
|---|
| 2. Typical Sign Layout (See Apple) | S | - | - | - | - | - | - | - | S | - | S | - | - | - | - | |
|---|
| 3. Installation Notes (See Apple) | S | - | - | S | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| 4. Fabrication and Material Notes (See Apple) | S | - | - | S | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| 4.6 Landscape Plans | | | | | | | | | | | | | | | | |
|---|
| A. Landscape Plans (See Landscapes) | S | - | - | S | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| B. Material Plan (See and Note See Landscapes) | S | - | - | - | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| 4.7 Permitting (See EGS and Bell) | S | - | - | S | - | - | - | - | S | - | S | - | S | - | - | |
|---|
| 4.8 Cost Estimate | | | | | | | | | | | | | | | | |
|---|
| A. 10 | | | | | | | | | | | | | | | | |
|---|
D GeometryP!an C S1teP!an 24 24 ~ 42 42 42
I ~ S4elwht,oo/Pho1ome1oo; 24 24 24 2 34 34 42
lnne,an 54000