3.11 MeetingsManhoursCostManhousesCostManhoursCostManhousesCostManhoursCostManhousesCostManhoursCostAvg. Hourly Ratio
A. Design Coordination Meetings (2)S-12$2,100.0012$1,620.00S-S-S-24$3,720.00$155.00
B. Design Review MeetingS-6$1,050.006$810.00S-S-S-12$1,660.00$155.00
C. Meeting with Utility ProvidersS--S6810.00S-S-S-8$810.00$155.00
Sub-Total Design Development9$1,980.00128$22,400.00275$37,125.00350$42,900.00147$14,700.006$360.00955$119,455.00$125.09
4.0 Construction Documents (100%)
4.1 CivilSite Drawings
A. Existing Conditions / SurveyS-1$175.001$135.002$250.00S-S-4$530.00$137.50
B. Distribution Plan1S220.008$1,400.004$540.004$440.00S-S17$2,020.00$132.94
C. Site Plan2S440.008$1,400.008$1,650.0024$2,640.00S-S42$5,560.00$132.38
D. Co-meeting Plan2S440.008$1,400.008$1,650.0024$2,640.00S-S42$5,560.00$132.38
E. Grading and Drainage Plan2S440.008$1,400.008$1,650.0024$2,640.00S-S42$5,560.00$132.38
F. Utility Plans See BellS----01-0-S-0-0S-
G. Signing and Marking Plans2S440.008$1,400.008$1,650.0024$2,640.00S-S42$5,560.00$132.38
H. Signage Graphics and DetailsS-2S350.0081,050.0024$2,640.00S-S34$4,070.00$119.71
I. Site Lighting / PhotometricsS-2S350.0081,050.0024$2,640.00S-S34$4,070.00$119.71
J. Civil DetailsS-2S350.002$210.002$210.00S-S8$4,000.00$140.00
K. Site Lighting DetailsS-2S350.002$210.002$220.00S-S6$640.00$140.00
L. SMPPPS-2S350.002$270.002$220.00S-S8$640.00$140.00
M. 2 Vehicle Tracking / ITS Plans
A. Technology PlansS-4$720.008$1,650.008$630.0016$1,500.00S-36$4,250.00$118.33
B. Technology DetailsS-2S350.008$1,650.008$850.004--22$2,710.00$123.18
4.3 Driver's Lounge Plans
A. Architectural Floor Plan (See Translytans)S-------S-S----
B. Architectural Roof Plan (See Translytans)S-------S-S----
C. Architectural Elevations (See Translytans)S-------S-S----
D. Architectural Sections and DetailsS--S-----S-S-S-
E. Structural Foundation PlanS-2S350.0081,650.0012$1,300.0016$1,850.00S-33$4,350.00$114.47
F. Structural Floor PlanS-2S350.0081,650.0012$1,320.0016$1,850.00S-33$4,350.00$114.47
G. Structural Roof PlanS-2S350.0081,650.0012$1,320.0016$1,850.00S-38$4,350.00$114.47
H. Structural DetailsS-2S350.004$540.002$220.00S-S8$1,110.00$138.75
I. Beam / Column SchedulesS-2S350.004$540.002$210.00S-S6$1,110.00$138.75
J. HVAC PlansS-2S350.004$540.008$850.004$400.00S-18$2,170.00$120.56
K. HVAC SchedulesS-2S350.004$540.008$850.004$400.00S-18$2,170.00$120.56
L. HVAC DetailsS-2S350.002$270.004$440.002$200.00S-10$1,250.00$126.00
M. Plumbing PlanS-2S350.004$540.008$850.004$400.00S-18$2,170.00$126.00
N. Plumbing SchedulesS-2S350.004$540.008$850.004$400.00S-18$2,170.00$126.00
O. Plumbing DetailsS-2S350.002$270.002$220.002$200.00S-8$1,040.00$130.00
P. Plumbing IsometricsS-2S350.004$540.008$850.004$400.00S-18$2,170.00$126.00
Q. Electrical PlanS-2S350.004$540.008$850.004$400.00S-18$2,170.00$126.00
R. Lighting PlansS-2S350.004$540.008$850.004$400.00S-18$2,170.00$126.00
S. Electrical SchedulesS-2S350.004$540.008$850.004$400.00S-18$2,170.00$126.00
T. Electrical DetailsS-2S350.002$270.004$440.002$200.00S-10$1,250.00$126.00
U. Technology PlansS-2S350.004$540.008$850.004$400.00S-16$2,170.00$126.00
V. Technology DetailsS-2S350.002$270.004$440.004$400.00S-12$1,450.00$121.87
4.4 Canopy Drawings
A. Architectural Plan (See Translytans)S-------S-S-S--
B. Architectural Elevations (See Translytans)S--S----S-S-S--
C. Architectural Details (See Translytans)S-------S-S-S--
D. Structural Foundation PlanS-2S350.004$540.0012$1,320.004$400.00S-22$2,610.00$116.64
E. Structural ElevatorsS-2S350.004$540.0012$1,320.004$400.00S-22$2,610.00$116.64
F. Structural DetailsS-2S350.004$540.0012$1,320.004$400.00S-22$2,610.00$116.64
G. Lighting Future ScheduleS-1$175.002$270.004$440.002$200.00S-9$1,085.00$120.50
H. Lighting PhotometricsS-1$175.002$270.004$440.002$800.00S-11$1,245.00$121.18
I. Lighting DetailsS-1$175.002$270.002$220.001$100.00S-6$765.00$127.50
A. May/finding Lights
A. Building Interior
1. Sign Location Plan (See Apple)S-------S-S----
2. Typical Sign Layout (See Apple)S-------S-S----
3. Installation Notes (See Apple)S--S----S-S-S--
4. Fabrication and Material Notes (See Apple)S--S----S-S-S--
4.6 Landscape Plans
A. Landscape Plans (See Landscapes)S--S----S-S-S--
B. Material Plan (See and Note See Landscapes)S-------S-S-S--
4.7 Permitting (See EGS and Bell)S--S----S-S-S--
4.8 Cost Estimate
A. 10
D GeometryP!an C S1teP!an 24 24 ~ 42 42 42
I ~ S4elwht,oo/Pho1ome1oo; 24 24 24 2 34 34 42
lnne,an 54000
Copy of Manhours_AVCON_SRQ GTC Fee Proposal 4-16-21.xls
Page 4