| C Pre-Application Meeting with Sarasota County | Manhours | Cost | Manhours | Cost | Manhours | Cost | Manhours | Cost | Manhours | Cost | Manhours | Cost | Manhours | Cost | Avg. Hourly Rate |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D Pre-Application Meeting with SWF-WHO | S | - | - | S | - | 6 | 610.00 | S | - | S | - | S | - | 810.00 | 130.00 |
| Sub-Total Schematic Design | S | - | - | S | - | 6 | 610.00 | S | - | S | - | S | - | 810.00 | 135.00 |
| Sub-Total Schematic Design | 10 | $2,200.00 | 74 | $12,950.00 | 181 | $24,439.00 | 212 | $23,320.00 | 100 | $10,000.00 | 6 | $360.00 | 583 | $73,289.00 | $125.68 |
| 3.0 Design Development (60%) | |||||||||||||||
| 3.1 C-wide Drawings | |||||||||||||||
| A Existing Conditions / Survey | S | - | 1 | $175.00 | 1 | $135.00 | 2 | $220.00 | S | - | S | - | 4 | $930.00 | $137.50 |
| B Demotional Plan | 1 | $220.00 | 4 | $703.00 | 8 | $1,080.00 | 6 | $880.00 | S | - | S | - | 21 | $2,869.00 | $137.14 |
| C Site Plan | 2 | $440.00 | 8 | $1,400.00 | 16 | $2,190.00 | 24 | $2,640.00 | S | - | S | - | 50 | $6,640.00 | $132.90 |
| D Geometry Plan | 2 | $440.00 | 8 | $1,400.00 | 18 | $2,160.00 | 24 | $2,640.00 | S | - | S | - | 50 | $6,640.00 | $132.90 |
| E Coating and Datesage Plan | 2 | $440.00 | 8 | $1,400.00 | 18 | $2,150.00 | 24 | $2,640.00 | S | - | S | - | 50 | $6,640.00 | $132.90 |
| F Utility Plans (See Bell) | |||||||||||||||
| G Signing and Marking Plans | 2 | $440.00 | 6 | $1,400.00 | 16 | $2,150.00 | 24 | $2,640.00 | S | - | S | - | 50 | $6,640.00 | $132.90 |
| L Lighting Graphics and Details | 2 | - | 2 | $260.00 | 16 | $2,160.00 | 24 | $2,640.00 | S | - | S | - | 42 | $5,150.00 | $122.62 |
| I Site Lighting Prototypes | 2 | - | 2 | $309.00 | 16 | $2,150.00 | 24 | $2,640.00 | S | - | S | - | 42 | $5,150.00 | $122.62 |
| J Civil Details | S | - | 2 | $359.00 | 2 | $270.00 | 2 | $220.00 | S | - | S | - | 6 | $840.00 | $140.00 |
| K Site Lighting Details | S | - | 2 | $359.00 | 2 | $270.00 | 2 | $220.00 | S | - | S | - | 6 | $840.00 | $140.00 |
| L SWPP | S | - | 2 | $359.00 | 2 | $270.00 | 2 | $220.00 | S | - | S | - | 6 | $840.00 | $140.00 |
| 3.2 Vehicle Tracking / ITS Plans | |||||||||||||||
| A Technology Plans | S | - | 6 | $1,400.00 | 18 | $2,180.00 | 20 | $2,200.00 | 24 | $2,400.00 | S | - | 68 | $8,160.00 | $120.00 |
| B Technology Details | S | - | 2 | $350.00 | 8 | $1,080.00 | 6 | $890.00 | 4 | $409.00 | S | - | 22 | $2,710.00 | $123.18 |
| 3.3 Driver's Lounge Plans | |||||||||||||||
| A Architectural Floor Plan (See Transytems) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| B Architectural Roof Plan (See Transytems) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| C Architectural Elevations (See Transytems) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| D Architectural Elevations and Details | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| E Structural Foundation Plan | S | - | 2 | $350.00 | 8 | $1,080.00 | 6 | $890.00 | 16 | $1,600.00 | S | - | 34 | $3,910.00 | $115.00 |
| F Structural Floor Plan | S | - | 2 | $350.00 | 8 | $1,080.00 | 6 | $890.00 | 16 | $1,600.00 | S | - | 34 | $3,910.00 | $115.00 |
| G Structural Roof Plan | S | - | 2 | $350.00 | 8 | $1,080.00 | 6 | $890.00 | 16 | $1,600.00 | S | - | 34 | $3,910.00 | $115.00 |
| H Structural Details | S | - | 2 | $350.00 | 4 | $640.00 | 2 | $320.00 | S | - | S | - | 8 | $1,110.00 | $138.75 |
| I Beam / Column Schedules | S | - | 2 | $350.00 | 4 | $540.00 | 2 | $220.00 | S | - | S | - | 8 | $1,110.00 | $138.75 |
| J HVAC Plans | S | - | 4 | $700.00 | 8 | $1,080.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 28 | $3,500.00 | $125.00 |
| K HVAC Schedules | S | - | 2 | $350.00 | 4 | $540.00 | 8 | $890.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $120.95 |
| L HVAC Details | S | - | 2 | $350.00 | 4 | $540.00 | 4 | $400.00 | 4 | $400.00 | S | - | 14 | $1,730.00 | $120.95 |
| M Plumbing Plan | S | - | 2 | $350.00 | 4 | $540.00 | 8 | $880.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $120.95 |
| N Plumbing Schedules | S | - | 2 | $350.00 | 4 | $540.00 | 8 | $880.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $120.95 |
| O Plumbing Details | S | - | 2 | $350.00 | 2 | $270.00 | 2 | $220.00 | 4 | $400.00 | S | - | 10 | $1,240.00 | $124.00 |
| P Plumbing Schematics | S | - | 2 | $350.00 | 4 | $540.00 | 6 | $880.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $124.00 |
| Q Electrical Plan | S | - | 4 | $700.00 | 8 | $1,080.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 28 | $3,500.00 | $125.00 |
| R Lighting Plans | S | - | 4 | $700.00 | 8 | $1,080.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 28 | $3,500.00 | $125.00 |
| S Electrical Schedules | S | - | 2 | $350.00 | 4 | $540.00 | 8 | $890.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $125.00 |
| T Electrical Details | S | - | 2 | $350.00 | 2 | $270.00 | 2 | $220.00 | 4 | $200.00 | S | - | 8 | $1,040.00 | $130.00 |
| U Technology Plans | S | - | 4 | $700.00 | 8 | $1,080.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 28 | $3,500.00 | $125.00 |
| V Technology Details | S | - | 2 | $350.00 | 4 | $540.00 | 8 | $890.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $125.00 |
| 3.4 Canopy Drawings | |||||||||||||||
| A Architectural Plan (See Transytems) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| B Architectural Elevations (See Transytems) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| C Architectural Details (See Transytems) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| D Structural Foundation Plan | S | - | 2 | $350.00 | 4 | $540.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 22 | $2,610.00 | $118.64 |
| E Structural Elements | S | - | 2 | $350.00 | 4 | $540.00 | 12 | $1,320.00 | 4 | $400.00 | S | - | 22 | $2,610.00 | $118.64 |
| F Structural Details | S | - | 2 | $350.00 | 4 | $540.00 | 8 | $880.00 | 4 | $400.00 | S | - | 18 | $2,170.00 | $120.56 |
| G Lighting Photometrics | S | - | 1 | $175.00 | 2 | $270.00 | - | - | 8 | $600.00 | S | - | 11 | $1,245.00 | $113.18 |
| H Lighting Details | S | - | 1 | $175.00 | 2 | $270.00 | 2 | $220.00 | 1 | $100.00 | S | - | 6 | $785.00 | $127.50 |
| 3.6 Playfinding Spices | |||||||||||||||
| A Building Interior | |||||||||||||||
| 1 Sign Location Plan (See Apple) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| 2 Typical Sign Layout (See Apple) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| 3 Installation Notes (See Apple) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| 4 Fabrication and Material Notes (See Apple) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| 5 Landscape Plans | |||||||||||||||
| A Landscape Plans (See Landscapes) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| B Material Plan (See Landscapes) | S | - | - | - | S | - | S | - | S | - | S | - | - | S | - |
| 3.7 Permitting (See EGS and Bell) | |||||||||||||||
| 3.8 Coal Estimate | |||||||||||||||
| 3.9 Technical Specifications | S | - | 1 | $175.00 | 4 | $540.00 | - | - | S | - | 6 | $360.00 | 11 | $1,075.00 | $97.73 |
| 3.10 Natural Calculations | |||||||||||||||
| A Structural Calculations | S | - | - | - | S | - | 4 | $440.00 | S | - | S | - | 4 | $440.00 | $110.00 |
| B HVAC Load Calculations | S | - | - | - | S | - | 4 | $440.00 | S | - | S | - | 4 | $440.00 | $110.00 |
| C Energy Calculations | S | - | - | - | S | - | 4 | $440.00 | S | - | S | - | 4 | $440.00 | $ |
Copy of Manhours_AVCON_SRQ GTC Fee Proposal 4-16-21.xls
Page 3