- M.M. Plumbing Plans
- M.Plumbing Plans
- N.Plumbing Schedules
- Plumbing Details
- P.Plumbing Isometrics
- Q.Electrical Plans
- R.Lighting Plans
- S.Electrical Schedules
- T.Electrical Details
- U.Technology Plans
- V.Technology Details
1.2 Canopy Drawings
- A.Architectural Plan
- B.Architectural Elevations
- C.Architectural Details
- D.Structural Foundation Plan
- E.Structural Elevations
- F.Structural Details
- G.Lighting Fixture Schedule
- H.Lighting Photometrics
- I.Lighting Details and Mounting Details
- Lighting Details and Mounting Details
1.3 Wayfinding Signs
- A.Building Interior
- A.Building Interior
- Sign Location Plan
- Typical Sign Layout
- Installation Notes
- Fabrication and Material Notes
- Fabrication and Material
1.4 Landscape Plans
- A.Landscape Plans
- B.Material Plan List and Notes
1.5 Cost Estimate
- A.A. 100% Opinion of Probable Construction Cost
1.6 Permitting
- A.Prepare, submit, and coordinate the permit application submittal for the site civil improvements to Sarasota County for Concurrent S&D/Construction Plan Review and approval.
- B.Track the review process and respond to County comments. We will respond to the requests for additional information as necessary during the review process and provide the County with additional information.
- C.Submit an application for an ERP Permit to the Southwest Florida Water Management District. Respond to comments as necessary to obtain the permit.