M. Plumbing Plans
Plumbing Plans
Plumbing Schedules
Plumbing Details
Plumbing Isometrics
Electrical Plans
Lighting Plans
Electrical Schedules
Electrical Details
Technology Plans
Technology Details
Architectural Plan
Architectural Elevations
Architectural Details
Structural Foundation Plan
Structural Elevations
Structural Details
Lighting Fixture Schedule
Lighting Photometrics
Lighting Details and Mounting Details
Lighting Details and Mounting Details
Building Interior
Building Interior
Sign Location Plan
Typical Sign Layout
Installation Notes
Fabrication and Material Notes
Fabrication and Material
Landscape Plans
Material Plan List and Notes
A. 100% Opinion of Probable Construction Cost
Prepare, submit, and coordinate the permit application submittal for the site civil improvements to Sarasota County for Concurrent S&D/Construction Plan Review and approval.
Track the review process and respond to County comments. We will respond to the requests for additional information as necessary during the review process and provide the County with additional information.
Submit an application for an ERP Permit to the Southwest Florida Water Management District. Respond to comments as necessary to obtain the permit.