3.11 Meetings
- A.Design Coordination Meetings – two meetings – AVCON in person. SubsVirtual, if required.
- B.Design Review Meeting – one meeting – AVCON In Person. Subs Virtual, if required.
- C.Meeting with Utility Providers – In person or in accordance with the agency guidelines
Deliverables:
- 60% Design Plans
- Technical Specifications
- Final Calculations
4.0 100% CONSTRUCTION DOCUMENTS PHASE
Provide Final Bid and Construction Documents, including design drawings, and associated details sufficient for bidding and construction.
4.1 Civil/Site Drawings
- A.Existing Conditions/ Survey
- B.Demolition Plan
- C.Site Plan
- D.Geometry Plan
- E.Grading and Drainage Plan
- F.Utility Plans
- G.Signing and Marking Plan (including exterior wayfinding signs)
- H.Sign Graphics and Color Details
- I.Site Lighting Plans/ Photometrics
- J.Civil Details
- K.Site Lighting Details
- L.Construction Stormwater Pollution Plan
4.2 Vehicle Tracking / ITS Plans
4.3 Driver's Lounge Plans
- A.Technology Plans
- B.Technology Details
- A.Architectural Floor Plan
- B.Architectural Roof Plan
- C.Architectural Elevations
- D.Architectural Sections and Details
- E.Structural Foundation Plan
- F.Structural Floor Plan
- G.Structural Roof Plan
- H.Structural Details
- I.Beam / Column Schedules
- J.HVAC Plans
- K.HVAC Schedules
- L.HVAC Details