Deliverables:

  • 30% Design Plans
  • List of Specifications
  • Preliminary Calculations
  • Preliminary Opinion of Probable Costs

3.0 DESIGN DEVELOPMENT PHASE (60% SUBMITTAL)

3.1 Civil/Site Drawings

Civil/Site Drawings A. Existing Conditions / Survey

  • Existing Conditions/ Survey
  • Demolition Plan
  • Site Plan
  • Geometry Plan
  • Grading and Drainage Plan
  • Utility Plans
  • Existing Utility Treatment
  • Water and Sewer Service to Driver's Lounge
  • Signing and Marking Plan (including exterior wayfinding signs)
  • Sign Graphics and Color Details
  • Site Lighting Plans/ Photometrics
  • Civil Details
  • Site Lighting Details
  • Construction Stormwater Pollution Plan

3.2 Vehicle Tracking / ITS Plans

  • Technology Plans
  • Technology Details

3.3 Driver's Lounge Plans

  • Architectural Floor Plan
  • Architectural Roof Plan
  • Architectural Elevations
  • Architectural Sections and Details
  • Structural Foundation Plan
  • Structural Floor Plan
  • Structural Roof Plan
  • Structural Details
  • Beam / Column Schedules
  • HVAC Plans
  • HVAC Schedules
  • HVAC Details
  • Plumbing Plans
  • Plumbing Schedules
  • Plumbing Details
  • Plumbing Isometrics
  • Electrical Plans
  • Lighting Plans
  • Electrical Schedules
  • Electrical Details
  • Technology Plans
  • Technology Details