Deliverables:
- 30% Design Plans
- List of Specifications
- Preliminary Calculations
- Preliminary Opinion of Probable Costs
3.0 DESIGN DEVELOPMENT PHASE (60% SUBMITTAL)
3.1 Civil/Site Drawings
Civil/Site Drawings
A. Existing Conditions / Survey
- A.Existing Conditions/ Survey
- B.Demolition Plan
- C.Site Plan
- D.Geometry Plan
- E.Grading and Drainage Plan
- F.Utility Plans
- Existing Utility Treatment
- Water and Sewer Service to Driver's Lounge
- G.Signing and Marking Plan (including exterior wayfinding signs)
- H.Sign Graphics and Color Details
- I.Site Lighting Plans/ Photometrics
- J.Civil Details
- K.Site Lighting Details
- L.Construction Stormwater Pollution Plan
3.2 Vehicle Tracking / ITS Plans
- A.Technology Plans
- B.Technology Details
3.3 Driver's Lounge Plans
- A.Architectural Floor Plan
- B.Architectural Roof Plan
- C.Architectural Elevations
- D.Architectural Sections and Details
- E.Structural Foundation Plan
- F.Structural Floor Plan
- G.Structural Roof Plan
- H.Structural Details
- I.Beam / Column Schedules
- J.HVAC Plans
- K.HVAC Schedules
- L.HVAC Details
- M.Plumbing Plans
- N.Plumbing Schedules
- Plumbing Details
- P.Plumbing Isometrics
- Q.Electrical Plans
- R.Lighting Plans
- S.Electrical Schedules
- T.Electrical Details
- U.Technology Plans
- V.Technology Details