2.4 Canopy Drawings

  • Architectural Plan
  • Architectural Elevations
  • Structural Foundation Plan
  • Structural Elevations
  • Preliminary Lighting Photometrics

2.5 Wayfinding Signs

  • Building Interior
  • Sign Location Plan
  • Typical Sign Layout
  • Installation Notes
  • Fabrication and Material Notes

2.6 Landscape Plans

  • Conceptual Landscape Plans
  • Material Plan List and Notes

2.7 Permitting

  • Schedule and attend one Pre-Application conference with the Sarasota County Development Review Committee (DRC) for purposes of confirmation of the feasibility of the proposed improvements and to obtain staff input and comments.
  • Schedule and attend one Pre-Application Meeting with the Southwest Florida Water Management District
  • Schedule and attend a Pre-Application meeting with Sarasota County for stormwater discharge permit.

2.8 Cost Estimate

  • A. 30% Opinion of Probable Construction Cost

2.9 Preliminary Technical Specifications (List and Outline)

2.10 Preliminary Calculations

  • Structural Calculations
  • Energy Calculations
  • Stormwater Calculations

2.11 Meetings

  • Design Coordination Meetings – two meetings – AVCON In Person. Subs Virtual, if required.
  • Design Review Meeting – one meeting – AVCON In Person. Subs Virtual, if required.
  • Pre-Application Meeting with Sarasota County – In Person or in accordance with the Agency guidelines
  • Pre-Application Meeting with Southwest Florida Water Management District – In Person or in accordance with the Agency guidelines