2.4 Canopy Drawings
- A.Architectural Plan
- B.Architectural Elevations
- C.Structural Foundation Plan
- D.Structural Elevations
- E.Preliminary Lighting Photometrics
2.5 Wayfinding Signs
- A.Building Interior
- Sign Location Plan
- Typical Sign Layout
- Installation Notes
- Fabrication and Material Notes
2.6 Landscape Plans
- A.Conceptual Landscape Plans
- B.Material Plan List and Notes
2.7 Permitting
- A.Schedule and attend one Pre-Application conference with the Sarasota County Development Review Committee (DRC) for purposes of confirmation of the feasibility of the proposed improvements and to obtain staff input and comments.
- B.Schedule and attend one Pre-Application Meeting with the Southwest Florida Water Management District
- C.Schedule and attend a Pre-Application meeting with Sarasota County for stormwater discharge permit.
2.8 Cost Estimate
- A.A. 30% Opinion of Probable Construction Cost
2.9 Preliminary Technical Specifications (List and Outline)
2.10 Preliminary Calculations
- A.Structural Calculations
- B.Energy Calculations
- C.Stormwater Calculations
2.11 Meetings
- A.Design Coordination Meetings – two meetings – AVCON In Person. Subs Virtual, if required.
- B.Design Review Meeting – one meeting – AVCON In Person. Subs Virtual, if required.
- C.Pre-Application Meeting with Sarasota County – In Person or in accordance with the Agency guidelines
- D.Pre-Application Meeting with Southwest Florida Water Management District – In Person or in accordance with the Agency guidelines