2.4 Canopy Drawings
Architectural Plan
Architectural Elevations
Structural Foundation Plan
Structural Elevations
Preliminary Lighting Photometrics
2.5 Wayfinding Signs
Building Interior
Sign Location Plan
Typical Sign Layout
Installation Notes
Fabrication and Material Notes
2.6 Landscape Plans
Conceptual Landscape Plans
Material Plan List and Notes
2.7 Permitting
Schedule and attend one Pre-Application conference with the Sarasota County Development Review Committee (DRC) for purposes of confirmation of the feasibility of the proposed improvements and to obtain staff input and comments.
Schedule and attend one Pre-Application Meeting with the Southwest Florida Water Management District
Schedule and attend a Pre-Application meeting with Sarasota County for stormwater discharge permit.
2.8 Cost Estimate
A. 30% Opinion of Probable Construction Cost
2.9 Preliminary Technical Specifications (List and Outline)
2.10 Preliminary Calculations
Structural Calculations
Energy Calculations
Stormwater Calculations
2.11 Meetings
Design Coordination Meetings – two meetings – AVCON In Person. Subs Virtual, if required.
Design Review Meeting – one meeting – AVCON In Person. Subs Virtual, if required.
Pre-Application Meeting with Sarasota County – In Person or in accordance with the Agency guidelines
Pre-Application Meeting with Southwest Florida Water Management District – In Person or in accordance with the Agency guidelines