1.12 Meetings

Kick-off Meeting: AVCON Staff in Person – Subs as needed Virtual Two Progress Meeting: Virtual Report Presentation: AVCON Staff in Person – Subs as needed Virtual

1.13 Cost Estimating

Alternative Cost Estimates will be provided for each alternative considered through the verification process and a final Cost Estimate will be provided for the recommended concepts.

This Phase will be documented with a Program Verification Report outlining the final recommendations that were approved by the Authority. If the approved site plan includes expanding the project area, scope modifications may be required. This Program Verification Report will serve as the basis of the design moving forward.

Deliverables:

  • Program Verification Report

2.0 SCHEMATIC DESIGN PHASE (30% SUBMITTAL)

Based on the results of the Program Verification Report the Design Documents will begin to be developed. Specific Elements of the 30% Plans are noted below:

2.1 Civil/Site Drawings

  • Existing Conditions/ Survey
  • Demolition Plan
  • Preliminary Site Plan
  • Preliminary Grading and Drainage Plan
  • Preliminary Utility Plan
  • Preliminary Signing and Marking Plan (including exterior wayfinding signs)
  • Site Lighting/ Photometrics

2.2 Vehicle Tracking / ITS Plans

  • A. Technology Plans

2.3 Driver's Lounge Plans

  • Architectural Floor Plan
  • Architectural Roof Plan
  • Architectural Elevations
  • Structural Foundation Plan
  • Structural Floor Plan
  • Structural Roof Plan
  • Preliminary HVAC Plan
  • Preliminary Plumbing Plan
  • Preliminary Electrical Plan
  • MEP Narrative of Systems