AVCON
1.12 Meetings
Kick-off Meeting: AVCON Staff in Person – Subs as needed Virtual Two Progress Meeting: Virtual Report Presentation: AVCON Staff in Person – Subs as needed Virtual
1.13 Cost Estimating
Alternative Cost Estimates will be provided for each alternative considered through the verification process and a final Cost Estimate will be provided for the recommended concepts.
This Phase will be documented with a Program Verification Report outlining the final recommendations that were approved by the Authority. If the approved site plan includes expanding the project area, scope modifications may be required. This Program Verification Report will serve as the basis of the design moving forward.
Deliverables:
Program Verification Report
2.0 SCHEMATIC DESIGN PHASE (30% SUBMITTAL)
Based on the results of the Program Verification Report the Design Documents will begin to be developed. Specific Elements of the 30% Plans are noted below:
2.1 Civil/Site Drawings
Existing Conditions/ Survey
Demolition Plan
Preliminary Site Plan
Preliminary Grading and Drainage Plan
Preliminary Utility Plan
Preliminary Signing and Marking Plan (including exterior wayfinding signs)
Site Lighting/ Photometrics
2.2 Vehicle Tracking / ITS Plans
A. Technology Plans
2.3 Driver's Lounge Plans
Architectural Floor Plan
Architectural Roof Plan
Architectural Elevations
Structural Foundation Plan
Structural Floor Plan
Structural Roof Plan
Preliminary HVAC Plan
Preliminary Plumbing Plan
Preliminary Electrical Plan
MEP Narrative of Systems