additional site plans will be developed within the original project limits. Driver lounge location will be re-visited, and recommendations will be provided to locate the facility away from the general public.
Evaluate the use of the existing system vs. a proposed new system. Recommend alternative systems and determine costs of each approach. Coordinate desired operations for ITS/Vehicle ID system with Airport. Identify locations of Proposed equipment, mounting requirements and infrastructure.
Based on the programmed number of vehicles, determine an occupancy load for the proposed building. Perform a space requirements analysis to determine the size of the driver's lounge and the required facilities.
Provide two alternative floor plans for consideration along with architectural elevations for consideration. Architectural style will mimic the Terminal Building and draft elevations will be provided as part of the Program Verification Phase
HVAC: Review architectural design concepts and provide preliminary mechanical equipment types and schematic unit sizing. HVAC equipment shall be high efficiency packaged equipment in accordance with the latest code edition and located for service accessibility. It is anticipated that heat pump equipment shall be provided for the moderate heating climate with auxiliary electric heating elements. System controls shall be tied into the airport BAS system, as necessary. Restrooms, locker rooms, and janitor closets shall be exhausted in accordance with code. Building insulation and glazing requirements shall be coordinated with the Architect and Energy Code Calculations shall be performed for permit submission in a later phase. Large volume industrial ceiling fans (BAF) can be considered for exterior driver and passenger waiting areas.
Plumbing: Design shall be provided based on the architectural conceptual plans. Points of connection for utilities shall be coordinated with the site civil team. Plumbing design shall include domestic hot and cold water, sanitary waste and vent, and storm drainage. Domestic water shall be extended to all plumbing fixtures shown on the architectural plans and to hose bibb locations at exterior of building around the perimeter. Electrical hot water heater(s) shall be provided to supply hot water to lavatories, sinks, janitor mop sinks, and other fixtures as required. A hot water recirculation loop will be provided if the maximum length from the water heater exceeds 30 feet. Tempered water shall be provided to all fixtures requiring hot water. Plumbing fixture selections and product data sheets shall be provided for approval by the airport. Fixtures shall be selected for durability in this environment, vitreous china and stainless fixtures are options. Touchless valves shall be proposed for personal hygiene.