PROJECT SCOPE OF SERVICES – Scope Outline (AECOM – CIVIL & STRUCTURAL ENGINEERING)

This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.

TASK 2 – GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST

1. Administrative Effort

  • Kick-Off Meeting/Pre-Design Meeting
  • Project set up activities, files, APIC, others
  • Coordination of Disciplines field work

2. Structural Effort

3. Civil Effort

  • Detailed Site Inspection to Verify Existing Conditions
  • Review and process geotechnical & survey data
  • Cost Estimating coordination (at each milestone)
  • 60% Submittal - QA/QC and review with GS/CMR
  • 90% Submittal - QA/QC and review with GS/CMR
  • 100% Submittal - QA/QC and review with GS/CMR
  • Plans Preparation (drawing coordination)
  • CSPP
  • FAA OE-AAA (7460-1) process
  • Project Specifications
  • Budget support/CMR Meetings
  • General Notes
  • Wind pressure sheet
  • Foundation Plan Terminal
  • Floor Plan Terminal
  • Roof Plan Terminal
  • Concourse A SD Foundation Plan
  • Concourse A SD Floor Pion
  • Concourse A SD Roof Plan
  • GBF Foundation Sections and Details
  • GBF Floor Sections and Details
  • GBF Roof Sections and Details
  • Beam Schedule
  • Column Schedule
  • Wall Elevations 0,
  • Blast Fence Foundation Design
  • SD Review
  • DD Review
  • CD Review
  • Coordination Meetings
  • General, Safety, Security Notes