This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.
Kick-Off Meeting/Pre-Design Meeting
Project set up activities, files, APIC, others
Coordination of Disciplines field work
Detailed Site Inspection to Verify Existing Conditions
Review and process geotechnical & survey data
Cost Estimating coordination (at each milestone)
60% Submittal - QA/QC and review with GS/CMR
90% Submittal - QA/QC and review with GS/CMR
100% Submittal - QA/QC and review with GS/CMR
Plans Preparation (drawing coordination)
CSPP
FAA OE-AAA (7460-1) process
Project Specifications
Budget support/CMR Meetings
General Notes
Wind pressure sheet
Foundation Plan Terminal
Floor Plan Terminal
Roof Plan Terminal
Concourse A SD Foundation Plan
Concourse A SD Floor Pion
Concourse A SD Roof Plan
GBF Foundation Sections and Details
GBF Floor Sections and Details
GBF Roof Sections and Details
Beam Schedule
Column Schedule
Wall Elevations 0,
Blast Fence Foundation Design
SD Review
DD Review
CD Review
Coordination Meetings
General, Safety, Security Notes