SCOPE DETAIL

e. Completion of Long Form Technical specifications. Draft MLM will work with GS to develop a base specification where MLM can contribute sections specifically and uniquely required in our Tasks and review common specification generated by GS to include requirements, products and execution required to address work in MLM Tasks.

  • Completion of floor plans, roof plans and reflected ceiling plans.
  • Identification of all wall, partition types and appropriate fire ratings.
  • Completion of building sections and elevations.
  • Completion of enlarged plans such as restrooms with associated toilet accessory schedules, toilet partition arrangements and enlarged details for vanity units and other design features.
  • Enlarged wall sections.
  • Completion of large-scale construction details โ€“ plan, section and 3-dimensional where required.
  • Completion of door, window, and louver schedules. Coordination with GS and SRQ Locksmith door and door hardware requirements to include in construction documents.
  • Millwork elevations and details. Coordinate with GS for uniform implementation in our projects.
  • Custom fabrications required for EVIDS supports, touchscreen displays and other similar systems.
  • Staircase details, guard rail details, escalator sections, elevator shaft sections.
  • Finalize all Color and Finish Selections (Interior and Exterior), provide samples for review and approval by SRQ. Coordinate with GS for uniform implementation in our projects and in finish schedules.
  • Coordination with building signage and dynamic signage.
  • Coordination with miscellaneous devices such as fire extinguisher cabinets, customer phones/emergency call stations.
  • Complete finish plans and finish schedules. Coordinate with GS for implementation in MLM projects.
  • Task 2 Construction Document Deliverables include:
  • QAQC review markup documents
  • ยท
  • Task 3 Construction Document Deliverables include:
  • Final Architectural building floor plans, reflected ceiling plans, roof plans, enlarged plans, sections, elevations, details.
  • Scheduling & Phasing: Work with the selected CM to refine the design and construction schedule, and further develop construction phasing plans and provide phasing analyses as well as define any early or enabling drawing packages.
  • Final Color and Finish Selections (Interior and Exterior.
  • Final technical specifications
  • Final Div. 00 & Div. 01 specifications

Permitting: Prepare drawings for the Plan Review submissions to the AHJ (Authorities having Jurisdiction) and respond to questions and provide supplemental information as required to complete the Plan Review process. Ensure bid documents are updated to reflect additional information provided to the AHJ. Attend meetings as required with the AHJ's to complete the plan review process.

Page | 18