MLM will be the Architect of Record and Coordinate with GS, SRQ and consultant team on Concourse B Bump-outs
MLM will be the Architect of Record and Coordinate with GS, SRQ and consultant team on proposed addition of two new escalators and replacement of two existing escalators. We anticipate MLM will present various options and or combinations for consideration by SRQ Operations and Pricing by CM to determine an optimum design solution. The agreed to scheme will then be further developed and submitted as an advanced 50% Design as the Schematic submittal.
MLM will be the Architect of Record and Coordinate with GS, SRQ and consultant team on proposed relocation of SRQ Board Room Suite. We anticipate MLM will present various options for consideration by SRQ and Pricing by CM to determine an optimum design solution. It is anticipated that the proposed location is as shown on the GS program and design scope exhibit on the Transfer level, South side at the fulcrum of the Landside terminal.
Team, Client & CM review, and coordinate and assist CM with pricing and GMP for Task 2. Design Development:
Concourse B bump out-MLM will provide drawings and assist GS in the review of master specifications and provide specific sections unique to work being performed in our Task Area (my assumption is that we will have a common set of specifications which will include sections prepared and needed by MLM area of work and GS and will require coordination and review by both) and Coordinate with GS, SRQ and consultant team on Concourse B Bump-outs
MLM will Prepare and ERP which will take the advanced 50% to a CD and Coordinate with GS, SRQ and consultant team on proposed addition of two new escalators and replacement of two existing escalators. The CD for this Escalator project will be completed at the DD of Task 3.
MLM will be the Architect of Record and Coordinate with GS, SRQ and consultant team on proposed relocation of SRQ Board Room Suite. MLM will prepare DD documents and review by SRQ and Team.
ERP Escalator signed and sealed drawings and specification for permitting & assist CM with pricing process and final GMP.
MLM will work with GS/Team, SRQ & CM review estimate for Concourse B Bump out and Board Room.
3. Construction Documents:
Scope of Services
November 9, 2021
MLM will prepare Construction Documents for Concourse B Bump-outs
MLM will prepare Construction Documents for Board Room.
MLM Coordinate with SRO, GS and consultant design teamwork associated with Concourse B Bump Out, and Board Room Relocation
Attend meeting with GS/Team, Client & CM review.
Submit Signed and Seal Documents for both projects to AHJ for permits and follow up responses.
Assist CM with pricing process to obtain GMP for projects.