SCOPE OUTLINE
PROJECT SCOPE OF SERVICES – Scope Outline (GRESHAM SMITH – WAYFINDING)
This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.
TASK 2 – PHASE 1 – GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST
- Schematic Design
- a.Project setup
- b.Field survey to document existing conditions
- c.Codes research
- d.Collect information from SRQ on existing interior signs standards/drawings
- e.Develop preliminary sign and wayfinding plan
- f.Presentation Preparation and Review w/SRQ
- Design Development
- a.DD Drawing Development and Coordination
- b.Coordination with other design disciplines
- c.Refine sign and wayfinding plan
- d.Temporary sign phasing plan
- Construction Documents
- a.Construction Document completion & coordination
- b.Specifications
- c.Temporary sign phasing plan finalization
- Permitting
- General Project Administration Activities
- a.Permit drawings
- a.QA/QC Off-Team reviews
TASK 2 – PHASE 2 - CONNECTION BETWEEN GBF & CONCOURSE B
- Schematic Design (30% Only)
- a.Develop preliminary sign and wayfinding plan
- b.Presentation Preparation and Review w/ SRO
- c.30% submittal
Page |7