SCOPE OUTLINE

PROJECT SCOPE OF SERVICES – Scope Outline (GRESHAM SMITH – WAYFINDING)

This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.

TASK 2 – PHASE 1 – GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST

  1. Schematic Design
  2. Project setup
  3. Field survey to document existing conditions
  4. Codes research
  5. Collect information from SRQ on existing interior signs standards/drawings
  6. Develop preliminary sign and wayfinding plan
  7. Presentation Preparation and Review w/SRQ
  8. Design Development
  9. DD Drawing Development and Coordination
  10. Coordination with other design disciplines
  11. Refine sign and wayfinding plan
  12. Temporary sign phasing plan
  13. Construction Documents
  14. Construction Document completion & coordination
  15. Specifications
  16. Temporary sign phasing plan finalization
  17. Permitting
  18. General Project Administration Activities
  19. Permit drawings
  20. QA/QC Off-Team reviews

TASK 2 – PHASE 2 - CONNECTION BETWEEN GBF & CONCOURSE B

  1. Schematic Design (30% Only)
  2. Develop preliminary sign and wayfinding plan
  3. Presentation Preparation and Review w/ SRO
  4. 30% submittal

Page |7