November 22, 2021 Board Meeting - Items Needing Action - Over $325,000 Threshold
PROJECT DEFINITION
Design also anticipates:
Scope of Services November 9, 2021
o Phase 2 elevated connector and additional gates (Concourse A) that will be designed to 30% SD level only.
o 2nd level shell space directly above the Ground Boarding Facility holdroom volume for subsequent Phase 2 connection.