Design also anticipates:
Scope of Services
November 9, 2021
o Phase 2 elevated connector and additional gates (Concourse A) that will be designed to 30% SD level only.
o 2nd level shell space directly above the Ground Boarding Facility holdroom volume for subsequent Phase 2 connection.