New 1-story Ground Boarding Facility (GBF) with five (5) aircraft gate positions connected to the east end of the Ticket Wing of the airport. Facility to include:
Independent SSCP and associated TSA support spaces
Expansion of ticket counters and associated ATO space
Ground boarding holdrooms
Passenger Amenities —
o Concessions
o Restrooms (pre-security and post-security)
Ground service support spaces
Vertical circulation core for Phase 2 elevated connector
Site utility relocation to be coordinated with ongoing in-line baggage screening CBIS and civil airfield/apron improvements to support the Ground Boarding Facility
MEP/CEP improvements and expansion to support the Ground Boarding Facility and other planned terminal expansion. Phase 1 will include analysis of two options:
Option 1: Expansion of existing CEP in its current location to handle full facility load
o Option 2: New standalone CEP to handle new GBF, but sized to eventually handle full facility load as systems are replaced.
Note that scope and fee are based on Option 1 above. If Option 2 is selected, additional design scope and fee is required.