SCOPE OF SERVICES SRQ TERMINAL CONCOURSE EXPANSION SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, PERMITTING, AND GMP ASSIST

PROJECT DEFINITION

Phase 1 of the Terminal Concourse Expansion project is broken down into two tasks. Task 2 will include design of a new 5-position Ground Boarding Facility (GBF) and all associated work. Task 3 will include a preliminary de-cluttering/realignment of existing Concourse B holdroom areas, followed by two "bump-out" expansions of the existing Concourse B for additional concessions and holdroom space, and a renovation of the Main Terminal Central Hub, which includes the addition of new escalators and the relocation of the existing SMAA Boardroom. Anticipated design schedule for each Task is forty-two (42) weeks, and will occur simultaneously.

Genuine Ingenuity

302 Knights Run Avenue Suite 900 Tampa, FL 33602 813.251.6838

GreshamSmith.com

FL Qualifier No. AR0013420 FL Registry No. RY3806