Project Fee Proposal - Arora Engineers, Inc.

SRQ TERMINAL CONCOURSE EXPANSION PROJECT

SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, PERMITTING, AND GMP ASSIST SERVICES

11/11/2021

SD, DD, CD, Permitting, GMP Assist Principal Chief Engineer II Discipline Lead Engineering/Discipline Manager Sr.Project Manager Project Manager Sr. Specialist III Sr. Specialist II Designer III Designer II BIM Manager BIM Technician Project Coordinator Total

Task Description

Task 1 - Conceal/Programming & Layout

Task 2 - Ground/Boarding Facility Design, Permits, GMP Assist 0

1 Schematic Design 0

1a Telecom 2 10 12 24 80 4 40 10 182

1b A/V 2 4 8 20 60 4 20 5 123

1c Security 2 10 12 30 80 4 40 10 188

2a Telecom 2 10 12 40 80 4 40 10 198

2 Design Development 0

2b A/V 2 4 8 20 60 4 20 5 123

2c Security 2 10 12 40 100 4 40 10 218

3a Telecom 4 4 10 12 40 100 4 40 10 224

3b A/V 2 4 4 10 30 60 4 20 10 144

3c Security 4 4 10 20 40 100 4 50 10 242

1b A/V 2 8 4 12 4 30

2b A/V 2 8 8 12 4 34

3a Telecom 1 2 2 20 16 12 4 57

1a Telecom 2 16 16 12 4 50

2 Design Development

2a Telecom 2 16 16 16 4 54

1c Security 2 16 16 12 4 50

2c Security 2 16 16 16 4 54

3 Construction Documents, Permits, GMP 0

3 Construction Documents, Permits, GMP

1 Schematic Design 0

III Task 3 - Terminal & Core B Expansion Design, Permits, GMP

3b A/V 1 2 2 20 8 12 4 49

3c Security 1 2 2 20 16 12 4 57

Subtotal Hours 13.00 30.00 - - 90.00 - 246.00 284.00 116.00 720.00 36.00 426.00 116.00 2077

Billing Rate $ 336.00 $ 258.00 $ 223.00 $ 213.00 $ 239.00 $ 219.00 $ 171.00 $ 159.00 $ 149.00 $ 103.00 $ 150.00 $ 126.00 $ 90.00

Subtotal Direct Labor $ 4,368.00 $ 7,740.00 - - $ 21,510.00 $ - $ 42,066.00 $ 45,156.00 $ 17,284.00 $ 74,160.00 $ 5,400.00 $ 53,676.00 $ 10,440.00 $ 281,800.00

TOTAL FEE $ 281,800.00

*