Project Fee Proposal - Holes & Associates
SRQ TERMINAL CONCOURSE EXPANSION PROJECT
SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, PERMITTING, AND GMP ASSIST SERVICES
11/11/2021
SD, DD, CD, Permitting, GMP AssistStaff EngineerCadd DesignerEngineering ManagerManaging PrincipalOffice AdministratorFill in staff titleFill in staff titleFill in staff titleFill in staff titleFill in staff titleFill in staff titleFill in staff titleFill in staff titleFill in staff titleTotal
Task Description
Task 1 - Conceptual Programming and Lawuit
Not included in Holes & Associates Steps of Services0
Task 3 - Conformance B Expansion
SD-Structural Design & Drafting (BIM production)5660116
SD-Quality Control & Review15520
DD-Structural Design & Drafting (BIM production)9660156
DD-Quality Control & Review15520
CD-Structural Design & Drafting (BIM production)23680316
CD-Quality Control & Review20828
0
Coordination Meetings1212
Site Visits1212
Client5050
Task 3 - Main Terminal Hub Escalators & Board Room
Escalators0
SD-Structural Design & Drafting (BIM production)7714
SD-Quality Control & Review314
DD-Structural Design & Drafting (BIM production)10818
DD-Quality Control & Review314
CD-Structural Design & Drafting (BIM production)301040
CD-Quality Control & Review538
Coordination Meetings44
Site Visits44
Client1111
Board Room0
SD-Structural Design & Drafting (BIM production)301545
SD-Quality Control & Review628
DD-Structural Design & Drafting (BIM production)301545
DD-Quality Control & Review7310
SD-Structural Design & Drafting (BIM production)382058
SD-Quality Control & Review9413
Coordination Meetings44
Site Visits44
Client2222
Subtotal Hours553.00275.0083.0052.0083.001046
Billing Rate$ 95.00$ 85.00$ 125.00$ 175.00$ 55.00
Subtotal Direct Labor$ 52,535.00$ 23,375.00$ 10,375.00$ 9,100.00$ 4,565.00$ -$ -$ -$ -$ -$ -$ -$ -$ 99,950.00