SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, PERMITTING, AND GMP for Task 2, GB/T 50010, 11/1/2021
SD, DD, CD, Permitting, GMP AsistPrincipalSr. Project ManagerProject ArchitectSpecification WriterSr. Interior DesignerRevit IIArchitectural DesignerDocument ControlChemical IIClinical IFill in staff titleFill in staff titleFill in staff titleTotal
1a. a. Coordinate with GS Concourse B Decluttering package, counter, seating, stings, Ets.416168448
1b. h. MLM is Architect of record and will Coordinate with GS, SRQ and Consultant Team and prepare SD documents for Concourse B Bump-outs.3684801543212398
12. e. MLM is Architect of record and coordinate with GS/term and SRQ. Prepare option for Escalator Expansion. Developed to 50% Design and submitted in this phase.29107116824414416664
1d. d. MLM is Architect of Record and will Coordinate with GS/term and SRQ. Prepare options for consideration by SRQ and pricing by CM. Documents for relocation of Board Room Suite.332872243160
1e. e. Team Client & CM project review, MLM will assist CM with Pricing and GMP for Task.83216864
2. Design Development0
2a. a. Concourse B Bump out-MLM will prepare drawings and assess GS review and specific master specifications Sections and Coordinate with GS/term and SRQ.26140462024421212700
2b. h. MLM will prepare Escalator Expansion Project FRP and coordinate with GS/term and SRQ.32118842822824424758
2c. e. MLM as Architect of Record for Board Room and coordinate with GS/term and SRQ. Prepare DD documents for review by SRQ.4018864448182
2d. d. ERP Escalator Signed and sealed drawings and specifications for permitting & CM pricing process and assist with final GMP.142662066
2e. e. MLM will work with GS/term, SRQ & CM review estimate for Concourse B Bump out and Board Room22426
3. Construction Documents0
3a. e. MLM will prepare Construction Documents for Concourse B Bump out1868872839030816915
3b. h. MLM will prepare Construction Documents for Board Room32161480568206
3c. e. MLM Coordinate with SRQ, GS and consultant design team work associated with Bumpo out and Board Room Relocation.8483288
3d. d. Attend meeting with GS/term, Client & CM review81624
3e. e. Submit Signed and Send Documents for both projects to A/U for permits and follow up with responses.62261650
3f. f. Assess CM with pricing process to obtain GMP for projects1632452
Subtotal Hours207.00828.00551.00106.001,524.001,064.00-111.004401
Billing Rate216.19201.40127.16100.90134.0194.78127.71127.1398.24$64.21
TASK 3-Concourse B Expansion Subtotal Direct Labor$44,751.33$168,773.20$70,065.16$10,695.40$-$144,444.72$135,883.44$-$-$7,127.31$$-$-$581,740.56
TASK 3 Concourse B Expansion-Recalor Expansion-Relocation of Board Room TOTAL FEE
Grand Total Hours383.001,188.00788.00148.00-1,862.001,348.00--183.00---5900
Billing Ratio$216.19$201.40$127.16$100.90$134.01$94.78$127.71$127.30$98.24$64.21$---
Grand Total Direct Labor$82,800.77$239,263.20$100,202.08$14,933.20$-$176,480.36$172,153.08$-$-$11,750.43$$-$-$797,583.12