Project Fee Proposal - Grisham Smith - Wavefuling (XDW)

SRQ TERMINAL CONCOURSE EXPANSION PROJECT

SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, PERMITTING, AND GMP ASSIST SERVICES

11/11/2021

SD, DD, CD, Permitting, GMP Assist XDW Principal XDW Sr Designer XDW Designer XDW BIM XDW Sr Designer Fill in staff title Fill in staff title Fill in staff title Fill in staff title Fill in staff title Fill in staff title Fill in staff title Fill in staff title Total

Task Description

  1. Task 1 - Conceptual Programming & Layout
  2. 0
  3. 11 Task 2 - Phase 1: Ground Bearding Facility Design, Permit, GMP Assist
  4. Schematic Design

1a Project set up 20 32 32

1b Field survey to document existing conditions 16 16

1c Codes research 8 8

1d Collect information from SRO on existing interior signs standards/drawings 8 40 48

1e Develop preliminary sign and wavefinding plan 4 8 20 20 52

1f Presentation Preparation and Review w/ SRO 4 8 8 4 24

  1. Design Development
  2. 2a DD Drawing Development and Coordination 10 24 60 40 134
  3. 2b Coordination with other design disciplines 4 16 16 16 52
  4. 2c Refine sign and wavefinding plan 4 12 32 8 56
  5. 2d Temporary sign phasing plan 4 20 40 20 84
  6. Construction Documents

3a CD Drawing Completion and Coordination 10 24 - 72 24

3b Specifications 8 8

3c Temporary sign phasing plan finalization 4 16 40 20 80

4 Permitting

4a Permit Drawings 8 16 8 32

5 General Project Administration Activities

5a Q/QC Off-Term Review 16

II Task 2 - Phase 2: Connection between GBF and Concourse B

1 Schematic Design (40% Only)

1a Develop preliminary sign and wavefinding plan 4 20 40 32 96

1b Presentation Preparation and Review w/ SRO 4 4 8 10 26

1c 30% submittal 8 16 40 16 80

Subtotal Hours 60.00 236.00 432.00 250.00 16.00 - - - - - - - - 848

Billings Rate $ 247.17 $ 186.06 $ 97.35 $ 86.55 $ 160.83 - - - - - - - - -

Subtotal Direct Labor $ 14,830.20 $ 43,910.16 $ 42,055.20 $ 21,637.50 $ 2,573.28 - - - - - - - - $ 125,006.34