WORK ORDER COST BREAKDOWN
PROJECT #:
WORK ORDER #:
LABOR DESIGNATION Rate OT Rate Reg. Hrs. OT Hrs. Reg. Cost OT Cost Total Cost
Project Superintendent $60.00 $90.00 160 50 $9,600.00 $4,500.00 $14,100.00
Lowboy $50.00 $75.00 16 5 $800.00 $375.00 $1,175.00
Gate Guard $102.61 $153.92 160 40 $16,417.60 $6,156.80 $22,574.40
Traffic Control Crew - set up phasing, erosion control $79.87 $119.81 120 37.50 $9,584.40 $4,492.88 $14,077.28
Excavation $145.27 $217.91 192 60 $27,891.84 $13,074.60 $40966.44
$0.00
$0.00
LABOR SUBTOTAL $92,893.12
MATERIALS Quantity Unit Price
Hay Bales 14 $8 $112.00
Slit Fence 2 roll $55.00 $110.00
MATERIAL SUBTOTAL $222.00
Lowboy Truck & Trailer Oper.Rate Idle Rate Oper. Hrs. Idle Hrs Oper.Cost Idle Cost Total
EQUIPMENT Blue Book 50%
Excavator 12 8 $211.25 $105.63 $3,380.04
192 60 $60.70 $30.35 $13,475.00
$0.00
EQPT. SUBTOTAL $16,855.04
SUBCONTRACTOR Quantity Unit Price
Ericson's - Install approx 290' of slotted pipe. Includes setting expansion material, install structural rebar around pipe, install slotted pipe system, place and finish concrete around slotted pipe. 1 LS $139,483.73 $139,483.73
AA Surface Pro - daily rate for layout and as-builts - total budget $5000 - amount may vary 1 LS $5000.00 $5,000.00
SUBCONTRACTOR SUBTOTAL $144,483.73
Unit Price
MISCELLANEOUS ITEM
Dump Truck - hired by the hour 16 hours $65.00 $1,040.00
MISC. ITEM SUBTOTAL $1,040.00
EXISTING PAY ITEM $0.00
$0.00
QUANTITY Unit Price
$0.00
$0.00
NOTES: EXISTING PAY ITEM SUBTOTAL
SUBTOTAL SUBCONTRACTOR $144,483.73
SUBTOTAL LABOR $92,893.12
SUBTOTAL EQUIPMENT $16,855.04
SUBTOTAL MATERIAL $222.00
SUB MARKUP 10% $14,448.37
LABOR MARKUP 5% $4,644.86
EQUIPMENT MARKUP 5% $842.75
MATERIALS MARKUP 10% $22.20
SUBTOTAL $274,411.87
LIABILITY & BOND $687.26
TOTAL $275,099.13
MISCELLANEOUS 10,000
EXISTING PAY ITEM $276,139.13
GRAND TOTAL
Form# PD68