| Basic Professional Services: | Lump Sum Fee |
|---|---|
| Task A – Design Documentation and Preliminary Design | |
| Architectural | $ 8,400.00 |
| Structural | $ 500.00 |
| MEPFP | $ 1,764.00 |
| Schematic Design - TOTAL | $10,664.00 |
| Task B – Schematic Design | |
| Architectural | $ 8,400.00 |
| Structural | $ 1,500.00 |
| MEPFP | $ 1,764.00 |
| Design Development - TOTAL | $11,664.00 |
| Task C – Final Design Phase: Prepare Plans and Specifications | |
| Architectural | $ 9,500.00 |
| Structural | $ 1,500.00 |
| MEPFP | $ 4,410.00 |
| Construction Documents - TOTAL | $15,410.00 |
| Task D – Bidding and Permitting Services | |
| Architectural | $ 4,000.00 |
| Structural | $ 262.00 |
| Bidding and Permitting - TOTAL | $ 4,262.00 |
| TOTAL BASIC PROFESSIONAL SERVICES | $42,000.00 |
The following Additional Services will be included as part of this Agreement:
| Surveying Services | $3,800.00 |
|---|---|
| Cost Estimating (2 estimates) | $7,500.00 |
| Landscape Architecture/Irrigation Design | $5,500.00 |
| Playground Design | $1,650.00 |
| Geotechnical Services | $4,000.00 |
| Civil Engineering | $31,800.00 |
| TOTAL INCLUDED ADDITIONAL SERVICES | $54,250.00 |
DIRECT COSTS – REIMBURSABLE EXPENSE ALLOWANCE: $2,000.00
TOTAL PROJECT FEES (EXCLUDING REIMURSABLE EXPENSES): $98,250.00
Page 6