the construction of the work, in a manner consistent with locally accepted standards for professional skill and care.
SSA shall incorporate into the Construction Documents the design requirements of governmental authorities having jurisdiction over the Project.
The Owner and SSA acknowledge that in order to construct the Work the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which SSA shall review in accordance with the Construction Administration Phase outlined below.
The Architect shall submit the Construction Documents to the Owner and request the Owner's approval.
Construction Document Phase includes up to (3) meetings with the Owner when applicable.
Meeting notes from each of the meeting(s).
Construction Documents to include:
Site/Floor Plan
■ Ceiling Plans
Roof Plan
Exterior Elevations
Wall Sections
Electrical Plans / Details
Vicinity Plan
Civil Engineering Grading, Drainage and Utility plans
Technical Specifications in book format
SSA to provide CAD files of Conformed Documents for the Owner's use. Hard copies and electronic versions will be provided.
Based upon Owner's approval of the Construction Documents, provide permitting necessary (unless specifically excluded below) to achieve signed/sealed drawings ready for the Contractor's bidding process and/or construction.
Submission of Construction Documents to applicable agencies for permit processing
Attend Pre-bid meeting, provide written responses to Bidder questions.
Answer review questions required by permitting agencies and GC. Assembly of addenda material and information as may be required to clarify issues.
Consultant should evaluate bids and determine the low responsive bid based upon project documents (may include reviewing licenses, work history, preparing a bid tabulation, checking match, confirming contractor has met DBE requirements, and other contract