o Graphics: Continuing to assist all departments and tenants with various signage projects and CAD requests. Working on property drawings for space and tenant baggage layout. Fence signage. Overflow parking signage and vehicle lettering. APD Traffic Control truck lettering.
o Loading Bridge: Monitoring for issues seven days a week due to increased usage. Treating canopies for cleanliness and preservation. Cleaning interiors. Treating for rust.
o Public Works: Mowing entire property. Various landscape maintenance and improvement projects in and around terminal. Maintaining Whitfield/Uplands twice a month. Avis Overflow parking cars. Creating overflow parking areas. Taking over cleaning of new bus stop structures. Assisting with Airfield discrepancies for Part 139.
Airfield: Mowing, lighting inspections, ramp marking painting. Paint markings south of Alpha. Pressure washing discrepancy areas on hard surfaces. Working on 139 preparation.
Conveyor Coverage: Coverage by two, three men shifts during the week and two, three-four men shifts both weekend days. Staffing has increased in peak times and days. Multiple repairs and modifications completed and underway to system. Hiring of 20 part-time staff/15 hired. Training of part time staff progressing well, have started decreasing full time staff.
o Industrial Mechanics: Jet Bridge PM's and checks. Conveyor system repairs and PM's. Scale box fabrication and installation complete. VSB storage cleaning. ARFF drywall underway. Plumbing repairs/inspections. 3rd Floor window leaks. Cable paths and penetrations for ITS/Comco projects.
HVAC: Awaiting cell three drive. VAV PM's. Secondary HVAC installed in TC-1B. Repairs to HVAC system serving 3rd floor administration offices.
o Electronics: Various cabling projects. Escorting contractors to pull cabling. Replacing cameras. Antenna escort and assist for Menzies. Selection of camera system for Facilities.
Electrical: Electrical PM's on various systems underway. Plan and material for ARFF bay re-lamp. Plan and material list for Facilities fan install. Plan and materials for Overflow A lighting. FPL load control accomplished. Christmas lighting planning. Avis lot additional lighting. Assisting with Vehicle Storage Building clean out.
o Carpentry: Leak repairs, pipe replacements. Will be starting demo at checkpoint. Skylights complete. Ticket counter complete. ARFF repairs. Core drilling for common use/IT projects. Repairs to checkpoint security gate. Repairs to Paradies security gate. Planning for future IT services for future tenants.
Vehicle Fleet: Mower repairs. Shuttle bus repairs/cleaning/maintenance. Second Dakota to be prepped for APD use. 24-foot trailers being prepped for use. Various vehicle PM's. Awaiting Wide Area Mower (WAM) warranty repair from Everglades (John Deere). Awaiting service caps for new Colorado trucks, trucks in service.
Janitorial: New SMAA Floor Techs are working out well, excellent results are being observed. Eight (8) techs hired and in training. One has been let go, for a total of 7. Have split to 4 and 3 shift with 7 day a week coverage. Terrazzo stripping/polishing completed in the ticket wing with good results. Restrooms will be next on terrazzo polishing schedule. Will be interviewing for vacant position.