Southwest Airlines: Southwest is seeking additional ticket office space and plans are in design for additional space below the Concourse at Gate B-10.
Allegiant: Properties and Allegiant are in discussions regarding additional space needs as Allegiant continues to grow at SRQ.
American Airlines: Additional space for American is in design in the lower level of the Concourse with buildout to be completed late 2021 or early 2022.
Avelo Airlines: Avelo Airlines announced it will be adding service to Sarasota and a Non-Signatory Agreement is in process.
Property #7/NEC and #12 NWC University & Bradenton Rd: SMAA application for DRI termination and rezoning in process and the required neighborhood meeting is scheduled for November 8. The hotel tenant, SRQ3, LLC, has also joined the zoning application to increase room count. A portion Property 7 is also planned to be utilized temporary for an economy parking lot to accommodate overflow parking needs while various projects are constructed.
Rental Car/Status: Phase I, remodel of ticketing, offices, and a covered walkway on hold. Phase II, development of a consolidated QTA lot/facility and expansion of the ready/return lot are both in design/planning. The site improvements and allocating additional spaces for the ready/return lot is on hold until such time parking capacity in the various parking lots are increased to accommodate parking demand.
Fuel Farm: Fuel Farm expansion Phase II underway and will add a third vertical storage tank.
Airport Hotel #3: The ground rent tenant has joined in the DRI/rezoning efforts underway to increase number of hotel rooms. A temporary license has been completed with this tenant to allow the airport to utilize the vacant hotel lot for overflow parking.
North Quad: SMAA has received interest from two FBO operators regarding developing a new FBO. SMAA has provided each with an invite to respond and responses are due in December. The relocation of the GA FIS facility to the N Quad is in process and design. Additional interest from potential tenants for hangar development remains strong and discussions continue. A real estate valuation has been completed as to rental rates and an Environmental Audit is underway which will be utilized as an environmental baseline with all future tenants at the N Quad.
Team Success: The Tenants sitework and buildings are underway, and the opening of the school will be fall of 2022. Team Success has requested additional lands to expand its campus and an amendment of the lease is under consideration. The amendment to the lease has been prepared and sent to the FAA for review/approval. Provided the FAA finds no issue with the amendment, the amendment will be at the next Board meeting for consideration/approval.