Total Collection Authority:$92,349,300Approved ExpirationCurrent Approved Imposed / UseCurrent Current Revenue Oct-21Current Interest Oct-21Total CollectionsTotal InterestTotal Revenue
Approved applications
Appl. 192-01-I-00/08-SRQCompleted13,945,01212,126,7771,817,61413,944,391
Appl. 295-02-U-00/05-SRQCompleted5,947,682
Appl. 3Completed8,746,770675,67374,388750,061
Appl. 410/3/200000-04-C-00-SRQ36,126,915
2/22/200200-04-C-01-SRQ2,368,148
7/23/200900-04-C-02-SRQ22,194,884
12/7/201700-04-C-03-SRQ(887,886)
Appl. 400-04-C-00/03-SRQCompleted59,802,06158,234,3081,567,75359,802,061
Appl. 55/7/201919-05-C-00-SRQ10/1/20228,817,424497,512.723,665.243,052,60614,7493,067,354
Appl. 69/8/202121-06-C00-SRQ4/1/20249,035,363-
106,294,312497,5133,66574,089,3643,474,50377,563,868
Project numberDescriptionUse Appl. #Estimated Implementation DateTotal Approved to UseExpenditures Month end Oct-21Total Expended to DateBalance to UseStatus
Various Projects25,947,682-5,947,682-Project complete
Various Projects38,746,770-8,746,769-Project complete
118Terminal development debt service410/1/200060,689,94759,802,061-
Amendment4(887,886)Project complete 4/21
59,802,061-59,802,061-
5.01Passenger Loading Bridge512/1/20212,579,9242,579,924-
5.02Administration Cost Reim512/1/202244,70044,700-Project complete
5.03Air Traffic Control Tower512/1/20216,192,800438,8035,753,997
Total8,817,424-3,063,4275,753,997Amount budgeted for FY 2022 is $8,002,229
6.01RIM Project6120,806120,806
6.02Master Drainage Plan6651,983651,983
6.03Stormwater System Imp6411,102411,102
6.04Ticket Wing Bag Belt Ext6577,190577,190
6.05Runway 14 Evaluation & Rehab6142,716142,716
6.06Wildlife Hazard Assessment62,9692,969
6.07ARFF Truck Replacement699,42399,423
6.08Access Control & Security Enhancements6995,819995,819
6.09Obstruction Survey6252,966252,966
6.10Design & Rehab ARFF Facility6349,271349,271
6.11Master Plan Update w/ Boundary Survey648,87848,878
6.12Taxiway Bravo North Rehab6152,846152,846
6.13PFC Administration681,85981,859
6.14Hearing Loop System662,83862,838
6.15Terminal Curbside Renovations63,250,0003,250,000
6.16Blast Fence Project Gate B26750,000750,000
6.17Baggage Heandling System Design6200,000200,000
6.18Security Checkpoint Modifications6384,697384,697
6.19Waypoint Sign Project6500,000500,000
9,035,363--9,035,363
Total all applications92,349,300$0$77,559,94014,789,360